Loading...
HomeMy WebLinkAboutTC Res 2020-04-15 R�SOLUTION NO. 1�1-2020 �� �A 12�SOLUTION OF TH� TOWN COUNCIL OP' TH� TOWN OF TIBURON APROPRIATIN(� ROAD REPAIR AND ACCOUNTABILITY ACT FUNDING AND ADOPTING A LIST OF PROJ�CTS TO B� FUNllED BY S�NAT� 13ILL 1: TI-�E ROAll R�YAIR AND ACCOUNTABILITY ACT WHI�REAS, Senate Bill 1 (SB l), the Road Repair and Accow�tability Act of 2017 (Chapter �, Statutcs of 20l 7) was passed by the Legislatui-e and Signed into ]aw by the Gover�loi- in April 2017 to address the significailt multi-modal transportation fund�ng shortfalls statewide., and WHCRTAS. SB l incltldes accountability and transparency provisions that will enstu�e t�he i•esidents of oui-Towi� are aware of the projects proposed for funding�n ouz•community and which projects llave been co�npleted each fiscal yeai•; and WHI:REAS,t}le Tow�1 must adopt by resolution a list of projects proposed to receive fiscal year fu�lding fi-om the Road Maintenance and Rehabilitation Account (RMRA), ci��ated by SB 1_ which must include a descl•iption and tlle location of each proposed project, a proposed scl�edule for t11e project's co�r�pletion, and the estimated usefizl life of the im�roveme�7t; a�ld WH�RCAS. the Town_ will rcceive an estimated $176,819 in KMRA funding in I'iscal Year 20?0-21 fi-on1 SB 1_ al�d WH�REAS, this is the fourtli vcar in which the Town is r-ece�ving SB 1 funding and ���ill enable the To���n to continue essential road nlaintenance a11d rehabilitation projects. saietv improvements, repairing alld replacing abing bridges, and increasing access and mobilit}� options for the traveliilb public that would not have otherwise been possible without SB l: and WH�REAS, the Tov��n used a Pavernent Ma�lageln�nt System to develop the SB 1 pro,ject list to enstn�e r�venues are being used o17 the most high-priority and cost-effective projects that also meet the community's pi-ioi-ities for transportation investment; and WHTRLAS,the funding fi�om SB 1 will help the Town maiiltain and rehabilitate its sU�ects and road� thi-oughout tl�c "I��own ai�d similar projects into the future; and WH�REAS_ the Town is anticipating to begin the 2022 Favement Maintenance and Rehabilitation Project in the 2021-22 fscal year. � ��VH�R�AS. witl�out�•evei�ue ti-om SB 1, the Town ���ill have a decreased ability to ui�det�take curi-ently planned paven�eut repair pi•ojects: and Pa�ze 1 of 5 To�a%n Co�ii�cil Resolution No. 14-2020 0�/15/2020 � ' WH�I2CAS, the 20]8 California Statewide Local Streets and Roads Needs Assessnlent � found tl�at t�he "I�owns streets and roads are in an "good" coildition and this revemie will help us inereasc the ovei-all quality of oLu-i-oad system and over the next decadc; a�zd WI�ER�AS_ t11e SB 1 project list alld overall investment in our local streets and roads infi-asti-uetui-e with a focus on basic maintenalice and safety, investing in complete streets infi�astrueture, and using cutting-edge technology, lnaterials and practiees, will have sig»ificant positive co-benefits statewide. NOW, THI;R�FORI�. IT IS HI:REBY RESOLV�D, ORDER�D AND FOUND by the Town Council of the Town of Tiburon, State of California, as follows: 1. The foregoing recitals are ti-L�e and correct. 2. Fwldi�lg i-eceived fi-om the SB 1 Program sl�all be saved in fiscal year 2020-2021 ai�d be allocated in tl�e Capital Improvement Plan budget for fiscal yeai• 2021-2022 for the ?022 Paven�cnt Maiiltienance and Rehabilitation Project. Design for th� Pi-oject is anticipated to begin in Fall of 2021 and construction to follow in the Siun�l�ei- of 2022 with use�ful pavement life of 20 years. Street Name Froin To PCI Project Schedule Avenida Mii-a Tiburon Blvd 500' E/O Hilaiy 91 Summei-2021 Flores Dr - -------..__. Avenida Mira 500` E/O Hilai•y Dr Francisco Vista 91 Summer 2021 Flores Avenida Mii-a Fi-ancisco Vista Miraflores 91 SuTnmer 2021 Flores Avenida Mira Mii-af7oi-es End 90 Swnmer 2021 T�UI'eS -- ---------- ---- --- Bartel Court Venado �nd 87 Summer 2021 Blacki�ield Dr 7�iburoi� B1�cl Gecilia Ave 85 Summer 2021 _--__ __.___ _. __------,—- -----. _ . v Blacklicld I��i- I�aren Way Reedland Woods 84 Stmlmer �021 wy Blackfield Di- � Reedland ���oods Via San Fei•nando 86 Summei- 2021 ���av -----..---------__.__.._---=--- ----- - B1ackl�ield Dr Via Sal� Fei�nando 1075 FT N/O Via 78 Su�ninei-2021 Sal� Fei•nando – -.._------ _. Boild Lane Taylor E�id 78 Sun�mer 2021 ------ _—_ Cibrian Drive "I�ayor Cul-de-sac 79 Su�nmer 2021 Cecilia Wav �I31ac1<field � End 76 Sumi��er 2021 Cccilia Wav I3lacltfield Rai�cho 73 Su�n���er 2021 Pa��e 2 of 5 To���n Council Resolution No. 14-2020 U4/15/2020 Street Name From To PCI Pro'ect Schedule � � Cecilia Wav Tibt�roi� Cayford 84 Sunlmer 2021 -----._ _._:------- - --_.__. ____-- -- � Centro East Ccnti-o West l 00 FT S/O 82 Slltniner 2021 Solano Centro East 100 FT S/O Sola�lo Pai-adise 82 Stnl�mer 2021 Circle Dr Cecilia Cecilia 80 Sunlmer 2021 Claii-e Way Kai-en (E) Karen (W) 8� Summei- 2021 Corte San Blackf�ield Cul-de-sac 8l Suminer 2021 Fernando Cypl-ess IIollow Rancho Bay Vista 73 Suinmer 2021 �1' Ureenwood Town Lilnit 550 FT W/O End 74 Su1nil�er 2021 Beacll Road Greenwood 550 FT W/O End �nd 75 Suminer 2021 Beach Road Harbor Oal< Dr Mariner End 84 Stullmer 2021 Harriet Way Cecilia Cul-de-sac 84 Summer 2021 Hilaiy Dr Avenida Miraflores Cul-de-sac 88 Summer 2021 Howard Dr Hilaiy Cul-de-sac 87 Summer 2021 Lel��d Way Karen Gccilia 68 Sum�ner 202] Lyford Di- Tiburo» Round Hill 92 Summer 2021 Lyford Dr Round Hill Acela 85 Summer 2021 Lyford Dr �cela Subarloaf 87 Summer 2021 Lyford Dr Sugai-loaf End 69 Sunlnler 2021 Mar East St Town Limit Linda Vista 80 Summer 2021 Marinei•o Cir Lyford L�-fot•d 71 Suinmei• 2021 Meadowhill Dr Ven�do �nd 71 Sun7�ner 2021 -- Monterev Dr Cy�ress l Iollow E�1d 76 Summer 2021 --=---- _---- -- -- Mount T�ibul-on Mt Tiburon Cul-de-sac 84 Suinmcr 2021 Ct Mount Tibw�on Round Hill Cul-de-sac 74 Suinmer 2021 Kd Pa�ncla Ct Blackficld Cul-de-sac 74 Suinmer 2021 ----------- ----- -- — Pal-adise Dr Roundabotlt Mal- West 76 Slu��mer 2021 Paseo Mir�sol Via San Fei-nando Via San �'ernando 87 SL�m�ner 2021 (N) ��) Paseo Mirasol Via San Ferna�ldo 800 FT N/O Via 87 Stunmer 2021 San Fei-na»do Paseo Mirasol 800 I�T N/O Via End 83 SLlm�ner 2021 San Fernando Rancho Dr Bav Vista Cecilia 78 Summer 2021 Rese��va Ln Centl-o East End 87 Stunil�er 2021 —.__..- -- — Santa Ana Ct I3a1-tel End 85 Sun��ner 2021 _...------._------ -- ---__ San Ra�1-ae1 A���e Tibui-on Town Limit 70 Sw1lu�er 2021 Solano St Mar Cast Ccntro East 80 Summer 2021 Page 3 of 5 Tow�n Council Resolution No. 14-2020 04/15/2020 Street Name From To PCI Pro'ect Scheclule ' Stewart Di- Tiburon Silverado 82 Slun�ner 2021 � Stewart Dr Roseville Redding 85 Summer 2021 Saint Gabl•iele Ct Su�7arloaf �nd 83 Sunlmer 2021 ----_—___— ---� ---- Stony Hill Road Gilmartin End 79 Sllinmer 2021 Su arloaf Dr L �ford I Ieathcliff Dr 70 Sumn�cr 2021 Su�arloaf Dr Heathcliff Dr U One Way 70 Suinmer 2021 SLigarloaf Dr Up One Wav Down One Way 73 Summer 2021 Taylor Iload Cibi-ian Cul-de-sac 70 Suinmer 2021 Venado Dr Lyford Cul-de-sac 62 Summer 2021 Via Ca istrano Reed Rancl� Frontage 76 Suminer 2021 Via Los Altos Blacktield l 320 FT N/O 84 Summer 2021 Blackfield Via Los Altos 13201�T N/O End 79 Summer 2021 Blackfield Vistazo East St Spanish Ti-ail 100 F`I' W/O 82 Summer 2021 S anish Trail Vi� Paraiso East Gilmartin Cul-de-sac 79 Summer 2021 Via Paraiso West Gi1�11artin Cul-de-sac 79 Summei• 2021 Warren Ct Hacienda Cul-de-sac 76 Summer-2021� 3. The following previously proposed and adopted 2020 Pavement Rehabilitation and Maintenance Project and 1-Iawtl�orne Undergroui�ding Project for Fiscal Year 2019-20 may utilize Fiscal Year 2020-21 Road Maintenance and Rehabilitation Account revenues in their delivery. Wiih the relisting of these projects in the adopted fiscal year resolution; the City/County is 1-eaffil-mi�Ig to the public and the Stat� our intent to fund these projects with Road Mail7tenance aild Rehabilitation Account revenues: Street Name From To PCI Pro'ect Schedule Hawthorne Drive East End Rocl�hill �}6 Siunmer 2020 ------_..----_.__---- —. I-��awthoi-ile Di-ive Rockhill West End 23 Summer 2020 -- ----- -- ------- --._._-- ---- Rock I-Iill Z�iburon Blvd Del Mar 35 Summer 2020 --------_ ---- — Rock Hill Del Mar Cu]-de-sac 77 Sluizmer 2020 Barn Road Ba}� Vista End 22 Summer 2020 _ —_—_.___.-------�--- -----_---- Corte Las Casas Reed Ranch CLil-de-sac 47 Summer 2020 Indian Rock Court Reed Ranch Cul-de-sac 3l Sum�i�ei�2020 Karen Way Blacl<field Cul-de-sac 63 Sumrner 2020 Steward Drive Sil��erado Tenava 58 Summer 2020 Steward Drive Tenava Ros�ville 65 Suminer 2020 � — -----.__--_.. Baccha�•is I'lace Cypress End 65 Summer 2020 Hollow Benton Colirt Haciei�da Cul-de-sac 62 Sunzmer 2020 ��� Blac]<field Drive Cecilia Ave Kai-c» Wy 68 Summer 2020 Buckwheat Court Blacl:field End 67 Summer 2020 Pa��c 4 01�.5 To��n Co�mcil Resolution No. 14-2020 04/15/2020 Street Name From To PCI Project Schedule � ��� Corte Palos Verdes Reed Rancl� Cul-de-sac 57 Summer 2020 �. '� Rancho Drive Cecilia Cul-de-sac 65 Sum�ner 2020 Turtle Rock Colirt Trestle Glen Cul-de-sac 62 Summei� 2020 Via Ca ish-ano Froi�ta�e Blackficld 64 Summer 2020 Vista Tiburon Via Los Altos Cul-de-sac 51 Sumil�er 2020 PASS�D AND ADOPTED at a special meeting oltl�e Town Council on April 15, 2020, by the following vote: AYES: COUNCILMEMBERS: Fredei-icks, Kulil<, Ryan, Thier, Welner NAYS: COtTNCILMEMBERS: None ALIC� I'REDERICKS, MAYOR "I,OWN OF TIBURON ATTEST: � , � � �.. ��� .�_.��..-�� LEA STEF NI, TOWN CLERK Page 5 of 5 To���n Council Resolution No. l�1-2020 04/15/2020