Town Council Resolution No. 27-2023 06/07/23
RESOLUTION NO. 27-2023
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF TIBURON ADOPTING
A LIST OF PROJECTS FOR FISCAL YEAR 2023-24 FUNDED BY SB 1: THE ROAD
REAPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor
in April 2017 to address the significant multi-modal transportation funding shortfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of our Town are aware of the projects proposed for funding in our community and which
projects have been completed each fiscal year; and
WHEREAS, the Town must adopt by resolution a list of projects proposed to receive fiscal
year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1,
which must include a description and the location of each proposed project, a proposed schedule
for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the Town, will receive an estimated $225,622 in RMRA funding in Fiscal
Year 2023-24 from SB 1; and
WHEREAS, this is the seventh year in which the Town is receiving SB 1 funding and will
enable the Town to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the Town used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high-priority and cost-effective projects that also
meet the community’s priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the Town maintain and rehabilitate its streets
and roads throughout the Town and similar projects into the future; and
WHEREAS, the Town is anticipating to begin the 2025 Various Streets Pavement
Rehabilitation Project in the 2024-25 fiscal year.
WHEREAS, without revenue from SB 1, the Town will have a decreased ability to
undertake currently planned pavement repair projects; and
DocuSign Envelope ID: C6FCD0E6-9C6A-4D12-8789-E378CD37243A
Page 2 of 5
Town Council Resolution No. 27-2023 06/07/23
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment
found that the Towns streets and roads are in an “good” condition and this revenue will help us
increase the overall quality of our road system and over the next decade; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits statewide.
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the Town
Council of the Town of Tiburon, State of California, as follows:
1. The foregoing recitals are true and correct.
2. The following list of newly proposed projects will be funded in-part or solely with Fiscal
Year 2023-2024 Road Maintenance and Rehabilitation Account revenues with design
anticipated to begin in Fall of 2024 and construction to follow in the Summer of 2025 with
useful pavement life of 25 years.
2025 Various Streets Pavement Rehabilitation Project
Street Name From To Description Beach Road Main St Marsh Overlay (greater than 2”)
Loma Avenue Vistazo East End Overlay (greater than 2”)
Mar West St Tiburon Esperanza Overlay (greater than 2”)
Rock Hill Drive Del Mar Cul De Sac Overlay (greater than 2”)
Gilmartin Drive Round Hill Dirt Extension Cul De Sac Overlay (greater than 2”)
Mar East Street Linda Vista Paradise Overlay (greater than 2”)
Old Rail Trail Parking Lot Parking Lot Parking Lot Overlay (greater than 2”)
Old Landing Road Paradise End Overlay (greater than 2”) Reed Ranch Road 135 FT S/O Via Capistrano 45 FT N/O Via Capistrano Overlay (greater than 2”)
Seafirth Place Seafirth End Overlay (greater than 2”)
Seafirth Road Paradise End Overlay (greater than 2”)
South Ridge West South Ridge Cul De Sac Overlay (greater than 2”)
Mateo Drive Paradise Begin Island Overlay (2” and under)
Felipa Court Avenida Mira Flores Cul De Sac Overlay (2” and under)
Sonora Court Stewart Cul De Sac Overlay (2” and under) Sutter Court Tenaya Cul De Sac Overlay (2” and under)
Tenaya Drive Steward End Overlay (2” and under)
Trestle Glen Blvd Juno Hacienda Overlay (2” and under)
DocuSign Envelope ID: C6FCD0E6-9C6A-4D12-8789-E378CD37243A
Page 3 of 5
Town Council Resolution No. 27-2023 06/07/23
3. The following 2022-23 previously proposed and adopted 2024 Various Streets Paving
Rehabilitation Project may utilize fiscal year 2023-24 Road Maintenance and
Rehabilitation Account revenues in their delivery. With the relisting of these projects in
the adopted fiscal year resolution, the City/County is reaffirming to the public and the State
our intent to fund these projects with Road Maintenance and Rehabilitation Account
revenues:
The estimated useful life for this project is 25 years.
2024 Various Streets Pavement Rehabilitation Project
Street Name From To Project Completion Description
Acacia Drive 525 Ft E/O Hacienda Cul-de-sac Summer 2024 Overlay (2” and under)
Diviso Street Centro East Vistazo West Summer 2024 Overlay (2” and under)
Esperanza
Street
Mar West Centro West Summer 2024 Overlay (2” and under)
Esperanza Street Cazadero Private Road Summer 2024 Overlay (2” and under)
Felipa Court Avenida Miraflores Cul-de-sac Summer 2024 Overlay (2” and under)
Francisco Vista Court Avenida Miraflores Cul-de-sac Summer 2024 Overlay (2” and under)
Geldert Drive Rowley Circle Porto Marino Summer 2024 Overlay (2” and under)
Harn Court Howard Cul-de-sac Summer 2024 Overlay (2” and under)
Juanita Lane Paradise Beach Summer 2024 Overlay (2” and under)
Lagoon View Drive Ridge End Summer 2024 Overlay (2” and under)
Main Street Paradise Job/Elbow Summer 2024 Overlay (2” and under)
Main Street Jog/Elbow Beach Summer 2024 Overlay (2” and under)
Malvino Court Geldert Cul-de-sac Summer 2024 Overlay (2” and under)
Mar East Street Linda Vista Paradise Summer 2024 Overlay (2” and under)
Mark Terrace Geldert Cul-de-sac Summer 2024 Overlay (2” and under)
Mar West Street Esperanza Paradise Summer 2024 Overlay (2” and under)
Mar West
Street
Tiburon Esperanza Summer 2024 Overlay (2” and under)
Midden Lane Paseo Mirasol End Summer 2024 Overlay (2” and under)
Miraflores Lane Avenida Miraflores End Summer 2024 Overlay (2” and under)
Neds Way Tiburon Pavement Change Summer 2024 Overlay (2” and under)
Old Landing Road Paradise End Summer 2024 Overlay (2” and under)
DocuSign Envelope ID: C6FCD0E6-9C6A-4D12-8789-E378CD37243A
Page 4 of 5
Town Council Resolution No. 27-2023 06/07/23
Street Name From To Project Completion Description
Paradise Drive Old Landing
Road
566’ N/O Old
Landing
Summer 2024 Overlay (2” and under)
Paradise Drive 5067 Paradise
Drive
5093 Paradise
Drive
Summer 2024 Overlay (2” and under)
Park Place South End Cibrian Summer 2024 Overlay (2” and under)
Pine Terrace Tiburon End Summer 2024 Overlay (2” and under)
Porto Marino Drive Hacienda End Summer 2024 Overlay (2” and under)
Raccoon Ave Centro West End Summer 2024 Overlay (2” and under)
Red Hill Circle Lyford 266’ S/O
Lyford/COP
Summer 2024 Overlay (2” and under)
Red Hill Circle 1304’ S/O
Lyford/COP
2109’ S/O
Lyford/COP
Summer 2024 Overlay (2” and under)
Red Hill Circle 266’ S/O Lyford/COP 1304’ S/O Lyford/COP Summer 2024 Overlay (2” and under)
Reed Ranch Road Tiburon 155’ S/O East Terrace Summer 2024 Overlay (2” and under)
Reed Ranch Road East Terrace Warrens Summer 2024 Overlay (2” and under)
Reed Ranch Road 155’ S/O East Terrace East Terrace Summer 2024 Overlay (2” and under)
Reed Ranch Road 135’ S/O Via Capistrano 45’ N/O Via Capistrano Summer 2024 Overlay (2” and under)
Reed Ranch Road 45’ N/O Via Capistrano End Summer 2024 Overlay (2” and under)
Reedland
Woods Way
Blackfield Dr Cul-de-sac Summer 2024 Overlay (2” and under)
Ridge Road Vistazo West Straits View Summer 2024 Overlay (2” and under)
Ridge Road 250’ W/O Straits View End Summer 2024 Overlay (2” and under)
Rowley Circle Howard Geldert Summer 2024 Overlay (2” and under)
Rowley Circle Geldert Hilary Summer 2024 Overlay (2” and under)
Seafirth Lane Seafirth End Summer 2024 Overlay (2” and under)
Seafirth Lane Paradise End Summer 2024 Overlay (2” and under) Spanish Trail Road Centro East 700’ from Centro East Summer 2024 Overlay (2” and under)
Straits View Drive Ridge End Summer 2024 Overlay (2” and under)
Tara Hill Road Round Hill Cul-de-sac Summer 2024 Overlay (2” and under)
Tara View
Road
Tara Hill Cul-de-sac Summer 2024 Overlay (2” and under)
Theresa Court Hilary Cul-de-sac Summer 2024 Overlay (2” and under)
Venus Court Juno Cul-de-sac Summer 2024 Overlay (2” and under)
DocuSign Envelope ID: C6FCD0E6-9C6A-4D12-8789-E378CD37243A
Page 5 of 5
Town Council Resolution No. 27-2023 06/07/23
Street Name From To Project Completion Description
Vista Del Mar Paradise Dr East End Summer 2024 Overlay (2” and under)
Vistazo West
Street
Diviso End Summer 2024 Overlay (2” and under)
Vistazo West Street Lyford End Summer 2024 Overlay (2” and under)
Wilkins Court Geldert Cul-de-sac Summer 2024 Overlay (2” and under)
PASSED AND ADOPTED at a regular meeting of the Town Council on June 7, 2023, by the
following vote:
AYES: COUNCILMEMBERS: Fredericks, Ryan, Welner
NAYS: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: Thier, One Vacant Seat
JACK RYAN, MAYOR
TOWN OF TIBURON
ATTEST:
LEA DILENA, TOWN CLERK