HomeMy WebLinkAboutTC Res 2015-01-21 (4)RESOLUTION NO. 04-2015
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF TIBURON
ADOPTING A REVISED FEE SCHEDULE FOR THE
COMMUNITY DEVELOPMENT DEPARTMENT AND NIICELLANEOUS SERVICES
PROVIDED BY OTHER TOWN DEPARTMENTS
WHEREAS, the Tiburon Municipal Code requires that any changes to the Community
Development Department's filing and processing fees be set forth by Resolution of the Town
Council, and
WHEREAS, it is the intent of the Town Council that such fees be used to reimburse the
Town for the costs of providing the services for which the fees are assessed, thereby maintaining
productive and efficient service levels commensurate with the work demands within the
Community Development Department, and
WHEREAS, from time to time it is necessary to revise fees to reflect actual costs incurred
by the Community Development Department and/or other Departments in the normal course of its
operation and according to its obligations to administer State statutory requirements under the
authority of Town ordinances, and
WHEREAS, the Town of Tiburon has provided required notice and held a public hearing
pursuant to state law and local ordinances.
NOW, THEREFORE, BE IT RESOLVED that the Town Council of the Town of Tiburon
does hereby adopt a revised fee schedule for the Community Development Department and
Miscellaneous Services Provided by Other Departments, said fee schedules being attached hereto as
Exhibit A and Exhibit B, and including miscellaneous services provided by other Town
Departments, said fee schedules to become effective 60 days from the passage of this resolution and
supersede the fee schedule set forth in Resolution No. 05-2013.
PASSED AND ADOPTED at the regular meeting of the Town Council of the Town of
Tiburon on January 21, 2015 by the following vote:
AYES: COUNCILMEMBERS: Doyle, Fraser, Fredericks, O'Donnell, Tollini
NAYS: COUNCILMEMBERS: None
ABSENT: COUNCII.MEMBERS: None
ATTEST:
1
DIANE CRANE IAC I, TOVON CLERK
Tiburon Town Council Resolution 04-2015 Effective 03/22/2015
SITE PLAN AND ARCHITECTURAL REVIEW (DESIGN REVIEW) PERMITS
(Design Review fees already include charges for noticing, plan storage, technology recovery, and
California Environmental Quality Act exemption)
Existing Building/Developed Lot
Ministerial (over-the-counter)...............................................................................................$50
Minor Alteration (staff level) and amendments thereto .....................................................$255
Design Review of less than 500 sq. ft. that do not qualify for staff level review..............$485
Design Review of between 500 and 1,000 sq. ft...............................................................$945
Design Review of 1,000 sq. ft. or more...........................................................................$1,325
Amendment to Design Review approval........................................................ 50% of filing fee
(unless the application qualifies for staff -level review, then) ............................................$255
New Residential or Non -Residential Building
InitialApproval................................................................................................................$2,825
Minor Amendment (qualifies for staff -level review) ........................................................$255
Major Amendment involving increased floor area
and/or significant design changes.................................................................. 50% of filing fee
Residential Floor Area Exception................................................................................................$230
Grading, Filling, or Earthwork requiring design review approval.........................................$805
fii CW1 9D11901(1R
(Sign Permit fees already include charges for plan storage, technology recovery, and California
Environmental Quality Act exemption)
Sign Permit (no Exceptions required)...................................................................................$90
Sign Permit Requiring a Minor Exception.........................................................................$125
Sign Permit Requiring a Major Exception.........................................................................$300
PLANNING CONFORMANCE CHECK ON BUILDING PERMIT APPLICATIONS
(Collected by Building Division at time ofpermit issuance)
Actual cost of Checker's time based on the Hourly Rate Schedule; minimum charge is 0.5 hours).
Tiburon Toivn Council Resokdion 04-2015 Effective 03/22/2015
SUBDIVISION AND RELATED PERMITS AND SERVICES
(Base fees do not include noticing, technology recovery, plan storage, or CEQA fees)
Lot Line Adjustment (Minor: four or fewer parcels)....................................................................$720*
Lot Line Adjustment (Major: five or more parcels) ........... .....................................................$1,800*
Lot Merger (Voluntary)
Tentative Map, where Final Map required:
..$230
a. For the first 5lots............................................................................................ $19,600*
b. For each additional lot..........................................................................................$260*
C. Amendment to previously approved Tentative Map ........................................$3,920*
Tentative Map, where Parcel Map required...............................................................................$3,920*
Planning Division Review of Final and Parcel
Extension of Time for Tentative Map .....................
Certificate of Compliance ......................................
Reversion to Acreage........................................................
CALIFORNIA ENVIRONMENTAL QUALITY ACT FEES
Determination of CEQA Exemption
Initial Study
EIR (full or focused)
EIR Administrative Overhead
Mitigation Monitoring and permit compliance review
760*
........$2,600*
....................................$1,300 *
................... $16,340*
................................... $50
............................$1,600*
$1,000 plus EIR contract cost
..............30% of EIR contract cost
...........................Actual Town cost
State Fish & Game Review Fees & County Clerk Filing Fee (as established by State law effective
January 1, 2013 and subject to change without notice; make checks payable to "Marin County
Clerk"):
a. Fish & Game and Filing Fee for Negative Declaration ................................ $2,210.00
b. Fish & Game and Filing Fee for Mitigated Negative Declaration ............... $2,210.00
C. Fish & Game and Filing Fee for Environmental Impact Report .................. $3,069.75
d. Environmental Document per Certified Regulatory Program ..................... $1,043.75
C. Matin County Clerk Processing Fee.................................................................$50.00
*Initial deposit amount only. Any remainder will be refunded; additional Staff time to process will be
billed per the Town's Hourly Rate Schedule.
Tiburon Town Council Resolution 04-2015 Effective 03122/2015
ADMINISTRATIVE SERVICES / MISCELLANEOUS
r
Services
General Plan on CD (full document)......................................................................................$5
StreetName Change*.......................................................................................................$1,280
General Plan paper copy (Individual Elements, including diagrams therein) .....................$10
Changeof Street Address....................................................................................................$170
Zoning Ordinance (including 11" X 17" color maps)..........................................................$30
Residential Parking Permit (collected by Police Department).............................................$25
Municipal Code (including 11" X 17" color zoning maps)...............................................$100
Noticing and Mailout of Permit Applications....................................................................$100
Design Review Guidelines (a.k.a. Hillside Guidelines Booklet)...........................................$5
Plan/Document Storage Fee..................................................................................................$65
Downtown Design Handbook (color)...................................................................................$20
TechnologyRecovery Fee.....................................................................................................$25
Downtown Design Handbook Furniture Supplement (I AW).................................................$5
Photocopies (regular)..................................................................................................
$.20/page
Photocopies(color).....................................................................................................
$.50/page
MicroficheCopies.......................................................................................................$.20/page
General Plan Land Use Diagram 2.2-1 (11" x 17" color) ......................................................
StaffResearch Fee........................................................................................................
$70/hour
Official Plans Duplication & Affidavit..... $50 per affidavit, plus actual plan duplication cost
Copy of Meeting Recording (CD)...................................................................
$15 per meeting
Town Clerk Certification of Copies..............................................................................$1/page
Special Event Permit: Low impact --$40; High impact=$100; Renewal
of Low impact = $20
Impounded Sign Recovery/Storage Fee........................................................................$40/sign
Blackie's PastureBlackfield Drive Banner Posting Fee...............................$25/banner
At cost
Publications & MaDS
General Plan paper copy (full document including 11" X 17" color diagrams)..................$50
General Plan on CD (full document)......................................................................................$5
General Plan paper copy (Individual Elements, including diagrams therein) .....................$10
Zoning Ordinance (including 11" X 17" color maps)..........................................................$30
Municipal Code (including 11" X 17" color zoning maps)...............................................$100
Design Review Guidelines (a.k.a. Hillside Guidelines Booklet)...........................................$5
Downtown Design Handbook (color)...................................................................................$20
Downtown Design Handbook Furniture Supplement (I AW).................................................$5
Open Space Resource Management Plan .............................................................................$25
All other publications......................................................................................................
At cost
General Plan Land Use Diagram 2.2-1 (11" x 17" color) ......................................................
$3
General Plan Land Use Diagram 2.2-1 (24" x 36" color)....................................................$30
Other General Plan Diagrams (11" x 17" color)....................................................................$3
Zoning Map (11" x 17" color)................................................................................................$3
Zoning Map (24" x 36" color)..............................................................................................$30
Planned Development Map (11" x 17" color)........................................................................$3
Othermaps......................................................................................................................
At cost
APPEALS
a. If applicant is the appellant**.................................................................................$500
b. If applicant is not the appellant...............................................................................$300
i *Initial deposit amount only. Any remainder will be refunded; additional Stajrtime to process will be billed per the Town's
Hourly Rate Schedule.
**Project applicant is responsible for all reasonable Town costs, including expert services and outside consultants, necessary to
process the application through a mal Town decision
Tiburon Town Council Resolution 04-2015 Effective 03/22/2015
PUBLIC FACILITY FEES AND OTHER DEVELOPMENT -RELATED FEES
Traffic Mitigation Fees — vanes by location (see Town Council Resolution No. 02-2007 or
successor document).
In -Lieu Housing Fee — varies (based on a formula contained in Tiburon Municipal Code Title IV,
Chapter 16).
Park & Recreation In -lieu Fee — varies (based on formula in Tiburon Municipal Code Title IV,
Chapter 14).
GENERAL FEE PROVISIONS
A. Fees shall be submitted in full at the time of application submittal to the Town. A penalty
fine equal to 100% of the regular filing fee is assessed for after -the -fact permit applications.
B. Pursuant to a written request, the Town Council may grant a full or partial waiver of fees
pursuant to applicable fee waiver policies adopted by Resolution of the Town Council.
C. Portions of fees may be refunded upon withdrawal of an application; the amount of the
refund shall be determined by the Director based upon the amount of work performed and
costs incurred by the Town prior to withdrawal.
D. Full fee credits may be granted by the Director toward resubmitted applications if
withdrawn and resubmitted within 60 days from the date of withdrawal.
E. Where work requires more than one permit, the full fee shall be collected for each and every
permit required.
F. Pursuant to Tiburon Municipal Code Title IV, Chapter 16 (Zoning), some fee waivers are
applicable to projects providing below market rate housing units.
G. If the Director determines that a contract planner will be required to process an
application, or assist Town Staff with processing of an application, the applicant shall be
responsible for all reasonable costs associated with said contract planner.
Tiburon Town Council Resolution 04-2015 Effective 0312212015 6
EXHIBIT B: BUILDING DIVISION FEES
BUILDING PERMIT FEE
The basis for the Building Permit Fee shall be the total valuation of the project; the actual fee shall
be calculated using attached Table 1. "Valuation of the project" includes all of the actual costs
incurred for the completion of the project. These costs include, but are not limited to, architectural
and engineering fees, site preparation, demolition, rough and finish carpentry, electrical, plumbing,
mechanical, scaffolding and other equipment rentals, grading, drainage, and winterization activities.
Where work is performed or materials supplied without monetary compensation, the fair market
value of labor and/or materials supplied shall be used for project valuation calculation purposes.
If the total valuation is not provided, the following schedule shall be used to establish a minimum
project valuation. Actual project valuation must be provided prior to final inspection and any
additional fees, based on actual project valuation, will be due and payable prior to final sign -off.
1. Apartment Houses:
TypeI or II F.R..................................................................................................... $171.00/sq.ft.
Type V - Masonry (or Type III).............................................................................. $137.00/sq.ft.
Type V - Wood Frame........................................................................................... $132.00/sq.ft.
TypeI Garage............................................................................................................ $70.00/sq.ft.
2. Dwellings:
TypeV -Masonry ..................................................................................................... $157.00/sq.ft.
TypeV -Wood Frame............................................................................................. $150.00/sq.ft.
Garage....................................................................................................................... $60.00/sq.ft.
Miscellaneous valuations: If total valuation is not provided at the time of application, the following
schedule shall be used:
1
01
3.
Sprinklered Structure (retrofits only)
$4.00/sq.ft.
Tenant Improvements - Commercial........................................................................ $45.00/sq.ft.
Block Walls & Pilasters (includes footings)
$6.00/sq.ft.
4. Retaining Walls (includes footings)......................................................................... $18.00/sq.ft.
5. Retaining Walls (wood)........
$6.00/sq.ft.
6. Greenhouse............................................................................................................... $12.00/sq.ft.
7. Patio, Solid Cover..................................................................................................... $14.00/sq.ft.
8. Patio, Lattice Cover.................................................................................................. $11.00/sq.ft.
9. Aluminum Patio Enclosure
10. Deck..........
Tiburon Town Council
Resolution 04-2015
....................................................... $60.00/sq.ft.
............................................................ $12.00/sq.ft.
Effective 0312212015 7
11. Demolition
12. Re -roof.
Project valuation to be substantiated by providing contract; Building Permit Fee shall be
calculated using Table 1.
13. Swimming Pool/Spa/Hot Tub:
Project valuation to be substantiated by providing contract; Building Permit Fee shall be
calculated using Table 1.
14. Miscellaneous Work:
Building Permit Fee for any work not covered by the above shall be based on the total
valuation for the project and the fees will be calculated using Table 1.
A BSCELLANEOUS FEES
Plan Storage fees:
Valuation
$1- $100,000......................................................................................................................$60.00
$100,001 - $200,000.........................................................................................................$120.00
$200,001 - $800,000.........................................................................................................$180.00
$800,001- over.................................................................................................................$250.00
2. Residential Resale Inspection/Residential Building Report (RBR) ................................$250.00
(plus $75 per each additional unit beyond the first)
3. Residential Resale Re -inspection: ...................................................................................... $75.00
4. Business License:
Projectvalue $1 - $5000.....................................................................................................$15.00
Project value $5001 - $25,000............................................................................................$25.00
Projects valued over $25,000.............................................................0.0012 of the Project value
Plan Checking Fees: All construction plans must be checked for conformance with State and
Town regulations. A plan checking fee shall be paid to the Town along with submittal of
construction drawings and specifications for review. Plan checking fees shall be 65% of the
building permit fees as set forth in Table 1. Where plans are incomplete, or changed so as to
require an additional plan check review, an additional plan review fee shall be charged by the
Town at a rate of $75 per hour, with a minimum charge of one hour or a standard plan check
fee, whichever is higher, in addition to any costs incurred by the Town for outside plan -
checking services.
6. Work Performed Without a Permit: Whenever any work for which a permit is required is
commenced without first obtaining a permit, a penalty fee shall be due and payable. The
penalty fee shall be calculated using the Town's current Resolution setting forth
Administrative Fines.
7. Long-range planning/general plan maintenance fee surcharge: 10% of building permit fees
(includes building, plumbing, electrical, mechanical, and grading fees)
Tiburon Town Council Resolution 04-2015 Effective 0312212015 8
8. Technology Recovery Fee surcharge as set forth in the following table:
TOTAL VALUATION
FEE
$ 1.00 to $ 5,000.00
$15.00
$ 25,001.00 to $ 50,000.00
$ 15.00 for the first $ 5,000.00 plus $ 3.00.00 for each additional $1,000.00, or fraction
$ 5,001.00 to 25,000.00
thereof, to and including $ 25,000.00
$ 25,001.00 to $ 50,000.00
$ 75.00 for the first $ 25,000.00 plus $ 2.50 for each additional $1,000.00, or fraction
Every $ 25,000 or fraction
thereof above $ 100,000.00
thereof, to and including $ 50,000.00
$ 50,001.00 to $ 100,000.00
$ 137.50 for the first $ 50,000.00 plus $ 2.25 for each additional $1,000.00, or fraction
thereof, to and including $ 100,000.00
$ 100,001.00 to $ 500,000.00
$ 250.00 for the first $ 100,000.00 plus $ 2.00 for each additional $1,000.00, or fraction
thereof, to and including $ 500,000.00
$ 500,001.00 to $ 1,000,000.00
$ 1050.00 for the first $ 500,000.00 plus $ 1.75 for each additional $1,000.00, or fraction
thereof to and including $ 1,000,000.00
$ 1,000,00t.00 and up
$ 1925.00 for the first $ 1,000,000.00 plus $ 1.50 for each additional $1,000.00, or
fraction thereof, but not to exceed $7,500.00
9. Other Inspections and Fees
a. Inspections outside of normal business hours: $75/hour (minimum charge 2 hours)
b. Re -inspection Fee: $75.00/hour
C. Inspections for which no fee is specifically indicated: $75/hour (minimum charge is 1
hour)
d. Additional plan review required by additions or revisions to plans: $75/hour (minimum charge
is 1 hour)
e. Outside consultants for plan checking, inspections, or both: Actual costs, which include
administrative and overhead costs incurred by the Town
10. California State Seismic Tax (Strong Motion Fee)
11. State Building Standards Commission Fee, as follows:
PERMIT VALUATION
FEE
$ 1.00 to $ 25,000.00
$ 1.00
$ 25,001.00 to $ 50,000.00
$ 2.00
$ 50,001.00 to $ 75,000.00
$ 3.00
$ 75,001.00 to $ 100,000.00
$ 4.00
Every $ 25,000 or fraction
thereof above $ 100,000.00
Add $ 1.00
Set by State
12. Undergrounding Extension Exception (Chapter 12A-3 of the Municipal Code)..... $60.00
ELECTRICAL PERIVIIT FEES
Any fees required by this division shall be paid by the applicant before any electrical work,
requiring a permit hereunder, is stared and the permit issued.
Tiburon Town Council Resolution 04-2015 Effective 03/2212015 9
PLUMBING PERMIT FEES
Any fees required by this division shall be paid by the applicant before any plumbing work
requiring a permit hereunder is started and the permit issued.
Minimum Fee: The minimum fee for any plumbing permit is $60.00, unless otherwise stated.
Miscellaneous Permit Fee: Any permit for miscellaneous plumbing work not in conjunction
with a building permit, and not itemized below, shall be a fee of $60.00 or 1.5% of the
contract cost, whichever is greater.
Residential Dwellings: For each plumbing permit for a one or two family dwelling unit or a
multi -family unit, the fee shall be based on 10% of the building permit fee, inclusive of
additions and alterations.
Commercial: Fees for commercial or industrial plumbing work (including retail stores,
offices, and motels) in conjunction with a building permit are as follows:
Office........................................................
Retail sales ................................................
Food markets ............................................
Restaurants ...............................................
..............10% of building permit fees
..............10% of building permit fees
..............10% of building permit fees
..............15% of building permit fees
ROOF -TOP SOLAR ENERGY SYSTEM THAT PROVIDES DIRECT CURRENT (DC)
ELECTRICITY*
Residential: $500, plus $15 per kilowatt for each kilowatt above 15kW (collected as electrical
permit fee)
Non-residential: $1,000 for systems up to 50 kW, plus $7 per kilowatt for each kilowatt between
51kW and 250kW, plus $5 per kilowatt for each kilowatt above 250kW (collected as electrical
permit fee)
* Fees subject to substantial waiver if the criteria set forth in the Policy for Solar Collector Panels are met (Resolution No. 13-2011
or successor).
Note: For non -roof -top solar energy systems, the permit fee is based on the valuation of the project
as set forth in Table 1)
GRADING PERMIT FEE SCHEDULE
Plan Check Fees:
1 to 50 cubic yards..............................................................................................................No fee
51 to 100 cubic yards..........................................................................................................$15.00
101 to 1,000 cubic yards.....................................................................................................$22.50
1,001 cubic yards to 10,000 cubic yards............................................................................$30.00
For each additional 10,000 cubic yards or fraction thereof above 10,000 cubic yards: .... $15.00
Tiburon Town Council Resolution 04-2015 Effective 0312212015 11
Permit Fees:
1 - 50 C.Y..........................................................*.................................................................$15.00
BUILDING PERbIIT FEE
51 -100 C.Y........................................................................................................................$22.50
101 - 200 C.Y.....................................................................................................................$33.00
201 - 300 C.Y.....................................................................................................................$43.50
$60.00
301 - 400 C.Y.....................................................................................................................$54.00
$69.25 for the fust $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and
401 - 500 C.Y.....................................................................................................................$64.50
including $25,000.00
501 - 600 C.Y.....................................................................................................................$75.00
$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and
601 - 700 C.Y.....................................................................................................................$85.50
including $50,000.00
701 - 800 C.Y.....................................................................................................................$96.00
$643.75 for the fast $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and
801- 900 C.Y..............................................................I....................................................$106.50
including $100,000.00
901 -1000 C.Y.................................................................................................................$117.00
$993.75 for the fast $100,000.00 plus $5.60 for each additional $1,000.00 orfraction thereof, to and
1001 -2000 C.Y...............................................................................................................$126.00
including $500,000.00
2001 - 3000 C.Y...............................................................................................................$135.00
$3,233.75 for the first $500,00.00 plus $4.75 for each additional $1,000.00 or fraction thereof, to and
3001 -4000 C.Y...............................................................................................................$144.00
including $1,000,000.00
4001 - 5000 C.Y...............................................................................................................$153.00
$5,608.75 for the fast $1,000,000.00 plus $3.15 for each for each additional $1,000.00, or fraction
5001 - 6000 C.Y...............................................................................................................$162.00
thereof
6001 - 7000 C.Y...............................................................................................................$171.00
7001 - 8000 C.Y...............................................................................................................$180.00
8001 - 9000 C.Y...............................................................................................................$189.00
9001 -10,000 C.Y............................................................................................................$198.00
Each additional 10,000 Cubic Yards is: .............................................................................
$40.50
PUBLIC FACILITY DEVELOPMENT FEES
Traffic Mitigation Fee — applies to development resulting in new vehicle trip generation; varies by
location (see Town Council Resolution No. 02-2007 or successor document).
Street Impact Fee —1 % of building permit project valuation
Stormwater Runoff Fee — $1 per each square foot of new impervious surface created by the project
TABLE 1
TOTAL
BUILDING PERbIIT FEE
VALUATION OF
THE PROJECT
$1.00 to $2,000.00
$60.00
$2,001.00 to
$69.25 for the fust $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and
$25,000.00
including $25,000.00
$25,001.00 to
$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and
$50,000.00
including $50,000.00
$50,001.00 to
$643.75 for the fast $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and
$100,000.00
including $100,000.00
$100,001.00 to
$993.75 for the fast $100,000.00 plus $5.60 for each additional $1,000.00 orfraction thereof, to and
$500,000.00
including $500,000.00
$500,001.00 to
$3,233.75 for the first $500,00.00 plus $4.75 for each additional $1,000.00 or fraction thereof, to and
$1,000,000.00
including $1,000,000.00
$1,000,001.00
$5,608.75 for the fast $1,000,000.00 plus $3.15 for each for each additional $1,000.00, or fraction
and above
thereof
Tiburon Town Council Resolution. 04-2015 Effective 0312212015 12