Loading...
HomeMy WebLinkAboutTC Res 2015-08-19 (4)L RESOLUTION NO. 33-2015 A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF TIBURON ADOPTING A REVISED FEE SCHEDULE FOR THE TOWN ENGINEER AND PUBLIC WORKS DEPARTMENT WHEREAS, the Tiburon Municipal Code requires that any changes to the Town's filing and processing fees be set forth by Resolution of the Town Council; and WHEREAS, it is the intent of the Town Council that such fees be used to reimburse the Town for the costs of providing the services for which the fees are assessed, thereby maintaining productive and efficient service levels commensurate with the work demands within the Town's various departments; and WHEREAS, new federal and state regulations, incorporated into Chapter 20A (Urban Runoff Pollution Prevention) of the Tiburon Municipal Code now require certain stormwater pollution prevention -related plans and drawings to be reviewed, approved, and inspected by municipalities, and the Town Council finds it necessary to recover the costs of these required reviews and inspections from applicant's whose projects trigger the requirements for these reviews and inspections; and WHEREAS, the documentation supporting this cost recovery fee are available for review in the Office of the Tiburon Public Works Director/Town Engineer; and WHEREAS, the Town of Tiburon has provided required notice and held a public hearing pursuant to state law and local ordinances. NOW, THEREFORE, BE IT RESOLVED that the Town Council of the Town of Tiburon does hereby adopt a revised fee schedule for the Town Engineer and Public Works Department staff, said fee schedule being attached hereto as Exhibit A, said fee schedule to become effective 60 days from the passage of this resolution and to supersede the fee schedule adopted by Town Council Resolution No. 05- 2015. PASSED AND ADOPTED at the regular meeting of the Town Council of the Town of Tiburon on August 19, 2015 by the following vote: AYES: COUNCILMEMBERS: Doyle, Fraser, Fredericks, O'Donnell, Tollini NAYS: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None Town Council Resolution No. 33-2015 FRANK DOYLE, MAYOR TOWN OF TIBURON Effective 10118\2015 Page 1 AI LEST: e DIANE CRANE IACOPI, TOWN CLERK Attachment: Exhibit "A" Town Council Resolution No. 33-2015 Effective 1011812015 Page 2 EXHIBIT A TOWN ENGINEER/PUBLIC WORKS DEPARTMENT FEE SCHEDULE (Effective 10/18/2015) The Town Engineer's application review fee includes the time spent by the Town Engineer and his staff to make one (1) site inspection, an initial review of submitted plans and maps for completeness, a second review of the submitted plans and maps, a consultation with Community Development Department staff and preparation of written conditions and/or recommendations. The fee for additional work beyond that specified above, and for other applications where a specific fee is not listed, will be based on the actual time spent by the Town Engineer or his staff in accordance with the Town's hourly rate schedule. A. Planning & Zoning Applications Conditional Use Permit (Major) Precise Development Plan B. $1,650* $2,600* Conceptual Master Plan $1,030* Traffic Study Review .. ..$1,030* Site Plan and Architectural Review Application Referral (complex applications only) Design Review application .$460* New Residence or Non -Residential Building $900.00* Grading, Filling or Earthwork $1,150* C. Subdivisions and Related Permits and Services Tentative Map Application $6,500.00* Final Map .$5,520.00* Parcel Map .$5,520.00* Subdivision Improvement Plan Review $6,500.00* Field Inspection 3% of the Value of Improvements D. Building Permit Drainage & Site Review Application New Building $640.00 Exterior Addition/Remodel $480.00 E. Encroachment Permit Application Processing Fee (applies to all Encroachment Permits) .$110.00** Debris Box -only Encroachment Permit Inspection Fee ..$80.00** Minor Encroachment Permit Inspection Fee $180.00** (e.g., driveway approaches, curb drains, fences, paving or concrete work Tess than 175 sq. ft.) Major Encroachment Permit Inspection and Plan Review Fee: 3% of Valuation of Improvements All other Encroachment Permit applications, in the reasonable discretion of the Town Engineer, are subject to a $325.00** initial deposit filing fee, and additional fees may be assessed based on actual processing time and adopted hourly rate schedules. F. Variance from Flood Damage Prevention Regulations (Chapter 13D of Municipal Code) .$750.00* G. McKegney Green Field Use Permit Application .$300.00** H. Stormwater Pollution Prevention Plan Review & Inspection (Chapter 20A TMC) Minor Project: $2,500*** Major Project: $5,000*** *Fee shall be considered an initial non-refundable deposit. Additional fees may be required if actual Town costs to process the application exceed this initial deposit amount. **Includes $25 Technology Recovery Fee ***Initial deposit amount only. Any remainder will be refunded; additional consultant time to review and/or inspect will be assessed on a time and materials basis. Town Council Resolution No. 33-2015 Effective 10h1812015 Page 3