Loading...
HomeMy WebLinkAboutTC Res 2016-07-20 (4)RESOLUTION NO. 22-2016 A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF TIBURON ADOPTING AN UPDATED TIBURON BICYCLE AND PEDESTRIAN MASTER PLAN AND ADOPTING A NEGATIVE DECLARATION FOR THE PROJECT WHEREAS, the Town Council of the Town of Tiburon does resolve as follows: Section 1. Findings. A. The Town of Tiburon is proposing to adopt a comprehensively updated Bicycle and Pedestrian Master Plan (BPMP), superseding the Plan adopted in 2008. The BPMP addresses a variety of issues related to bicycle and pedestrian transportation in Tiburon while meeting the California Bicycle -Transportation Act requirements for such Plans. The project is Town file S2016-03. B. The Town prepared an Initial Study for this project and determined that a Negative Declaration was appropriate for the project pursuant to the requirements of the California Environmental Quality Act (CEQA). C. The Parks Open Space and Trails Commission (POST), acting in its capacity as the Town's Bicycle and Pedestrian Advisory Committee, held two public workshops and a public meeting to take input from the public on the Plan update, and following its public meeting recommended adoption of the Plan to the Town Council. D. On May 11, 2016, a Draft Negative Declaration was completed and notices of its availability were publicly posted and advertised in the Ark newspaper to announce a 21 - day public review and comment period from May 16, 2016 to June 6, 2016 on the Initial Study/Draft Negative Declaration, in conformance with CEQA requirements. A notice of public meeting on the Draft Negative Declaration and the project was also publicly posted, published in the Ark newspaper, and mailed notice was also provided. E. The Planning Commission held a duly noticed public hearing on May 25, 2016 and heard and considered testimony from interested persons. The Planning Commission found that no substantial evidence in support of a fair argument that the project would result in an adverse impact on the environment had been received, and that adoption of the Negative Declaration was in order. The Planning Commission further found that the Tiburon Bicycle and Pedestrian Master Plan Update would be consistent with polices within the Tiburon General Plan and recommended adoption of the updated Plan to the Town Council. F. The Town Council held a duly noticed public hearing on July 20, 2016 and heard and considered testimony from interested persons. The Town Council found that no TIBURON TOWN COUNCIL RESOLUTION No. 22-2016 07/20/2016 1 substantial evidence in support of a fair argument that the project would result in an adverse impact on the environment had been received, and that adoption of the Negative Declaration was in order. The Town Council further found that the updated Tiburon Bicycle and Pedestrian Master Plan Update would be consistent with polices within the Tiburon General Plan. Section 2. Adoption of Negative Declaration. NOW, THEREFORE BE IT RESOLVED that the Town Council of the Town of Tiburon does hereby adopt the Negative Declaration for the project and directs that a Notice of Determination be filed with the Marin County Clerk. Section 3. Adoption of Bicycle Pedestrian Master Plan Update With Revisions. BE IT FURTHER RESOLVED that the Town Council of the Town of Tiburon does hereby adopt the Bicycle and Pedestrian Master Plan Update, with the final adopted version to be dated July 20, 2016 and to incorporate the revisions to the March 17, 2016 draft document as follows: 1. Revise and incorporate Table 4-1 as set forth in attached Exhibit "A". [Note: This revised table would incorporate Planning Commission recommendations to add Safe Routes to School signage and pavement markings on Greenwood Beach Road; closely monitor Project No. 2 (Blackfield Drive bicycle and pedestrian improvements) after installation for its safety and effectiveness; add a new project (Project 7A) designating the area along Tiburon Boulevard from U. S. Highway 101 to Trestle Glen Boulevard as a "special study zone" for the purposes of studying the feasibility of Class IV bike lanes along both sides of Tiburon Boulevard and the feasibility of relocation of the San Francisco Bay Trail from Greenwood Beach Road to Tiburon Boulevard] 2. Add Project 7A to Figure 4.1 (graphic showing general project locations). 3. Add Section 4.1.4 to read as follows: 4.1.4 Proposed Class IV Study — Separated Bicycle Routes The Town of Tiburon recognizes that Tiburon Boulevard from U. S. Highway 101 to Trestle Glen Boulevard is a primary route and potentially a better future route for cyclists if it were improved. The Town recognizes that only a minor portion of Tiburon Boulevard in this segment is located within the Town's corporate limits; however, Tiburon supports working with the County of Marin, Caltrans and other agencies to study the feasibility of building a Class IV bike system on both sides of Tiburon Boulevard from U. S. Highway 101 to Trestle Glen Boulevard. This TIBURON TOWN COUNCIL RESOLUTION No. 22-2016 07120/2016 2 study could also evaluate a Class I bikeway on one side of Tiburon Boulevard and a Class IV on the other side in those segments where such an approach would be more practical. The study could also evaluate the feasibility of relocating the San Francisco Bay Trail alignment to Tiburon Boulevard from Greenwood Cove Drive/Greenwood Beach Road in this segment, without excluding the Richardson Bay Audubon Society from the San Francisco Bay Trail. 4. Add Section 5.9.8 to Appendix A of the Plan to read as follows: 5.9.8 Bay Trail Project Grants The Bay Trail Project has been the source of funds on three separate occasions for bicycle and pedestrian -related projects in Tiburon. In 2003 the Bay Trail Project funded a feasibility study for Class II bike lanes on Trestle Glen Boulevard. In 2005, it funded construction of bicycle and pedestrian improvements along Trestle Glen Boulevard. In 2011, the Bay Trail project funded the Bay Trail Gap Closure Feasibility Study. More information: http://www.baytraiLorg 5. Section 4.3.5 [Education and Enforcement Programs] shall be augmented to add text calling for the development of "sustainable bicycle and pedestrian safety and education programs" and providing examples of such programs, with final wording to be determined and inserted into the Plan by Town staff. 6. Make incidental revisions as necessary to achieve consistency with the above- described revisions. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Tiburon on July 20, 2016, by the following vote: AYES: COUNCILMEMBERS: NAYS: COUNCILMEMBERS: Doyle, Fraser, Fredericks, O'Donnell, Tollini None ERIN TOLLINI, MAYOR TOWN OF TIBURON ATTEST: DIANE CRANE IACOPI, TOWN CLERK Attachments: Exhibit "A": Revised Table 4-1 TIBURON TOWN COUNCIL RESOLUTION No. 22-2016 07/20/2016 3 C/3 "° a4'48., C o u o 0 v a cn N a.1 1c1-1 n ai a a Cc O• • ad :04 VaU a) > .5 'd O 'dcl O d) s+ 'd 0 0O..b- 5O„? Hca ` ^ 0 ' Id '°O3 p N FQ U Q -0bA O oObA .:..VP.5 j�j.rs- i 0 a) ct CO .5 ct .4 4. * a a 0.4 r p t ''0 u O, y a H es P-4 a -o v3w N -J' N by n .0 , °' a 4—o H O .d �a o2 o 'w Q)•V cn .., 0 : u U mi w E u w ›ct O . 0c 4 c -- Gd uV 7.O O •. Up N p u av 1)1).0UO + O ii .13 -o u -0 ate, O • ct �! ct�jS th Pg ,4 b.0 vs a) U Q) v7 a�7 -0 +V� 1 O ' a w Fq a c)H � P.4 c'.5c''v,`o2 8/3 G y LL. v w O O gg z 0 V a) 1.4 a) G enhancements d E m z PCI Blackie's Grove z z 44 -° 0 0 cV O „0 o w Q .c a Pr H PCI U RESOLUQON NO. 22-2016 TIBURON TOWN COUNCIL RESOLUTION NO. 22-2016 TIBURON TOWN COUNCIL Class II (bicycle 0.61 $2 million+ Class II bike lanes on both sides ora lane)/Class III combination Class II/III with bike lanes (bicycle route) on uphill direction. To Be 0.01 $100,000 Improve transition from Class I facility Determined on Tiburon Boulevard west of Mar West Street to Class II facility east of Mar West Street. Coordinate with planned signal or roundabout at this location. Class III (bicycle 0.54 $10,000 Stencil or sign Class III bicycle routes route) Class II (bike 1.0 $90,000 Subject to Caltrans and County approval; lanes) convert existing striped shoulder to Class II bike lanes Class IV lanes 3.5 $200,000 Designate this corridor a "special study rFp��;l- 1iti cn,cly zone". In coordination with the County Name Begin Road (approximately 150 feet south of Barbaree Way Tiburon Boulevard Mar West Street Mar West Street Town limits U. S. Highway 101 Project #4: Trestle Glen Boulevard y 0 • F 4, i-1 H L 4 % P-1 ?)o Ca .n LL,, H w '4.4 b i.l ct o - RESOLUTION NO. 22-2016 TIBURON TOWN COUNCIL 0a 0 d v 3 04 a 72, v C2 v L' rg C.7 rIgE ,8 : B� 0 .0 'CIaCi cd 2.4 Cc)o C v C 1.4 cc E' y u 0 W 0) E c0 z Total Proposed Class I Bikeways + 0 O (s,eF t-. Total Proposed Class II Bikeways 00 O Total Proposed Class III Bikeways 0 O 0 art M O O N-. 4A 0 0 v 0 0 4 0 O O CO N Feasibility Study O O c) O M N Total Proposed Bikeways 0) a) 1• .00.1 o O E c v 00 N ✓ • � O O• o C C:� g m v • w b • cd ~O V' -O v cyc u o -d .0 23 N O a v v y cd O 61 a) Cl.‘ pu .5 • cn U O ,v L'' o 0 :.4 ar C w O 0 v ▪ v Ca C v o•"" J ub ab g C O • • v y cua ) � vv+ • a7 cd • O _d cd Y 7.3 U C ) bA o cn.5 c0e ▪ C f 1 m v O ✓ -O • 0 v C Ou .g • a - bA• 0cd 0•o cdVi L aUiJ � *'. u . C cc�3a RESOLU1ON NO. 22-2016 TIBURON TOWN COUNCIL