Loading...
HomeMy WebLinkAboutTC Res 2008-01-16 (7) RESOLUTION NO. 07-2008 A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF TIBURON ADOPTING A REVISED FEE SCHEDULE FOR THE TOWN ENGINEER AND PUBLIC WORKS DEPARTMENT WHEREAS, the Tiburon Municipal Code requires that any changes to the Town's filing and processing fees be set forth by Resolution of the Town Council, and WHEREAS, it is the intent of the Town Council that such fees be used to reimburse the Town for the costs of providing the services for which the fees are assessed, thereby maintaining productive and efficient service levels commensurate with the work demands within the Town's various departments, and WHEREAS, from time to time it is necessary to revise these fees to reflect actual costs incurred by the various departments in the normal course of its operation and according to its obligations to administer State statutory requirements under the authority of Town ordinances, and WHEREAS, the Town of Tiburon has provided required notice and held a public hearing pursuant to state law and local ordinances. NOW, THEREFORE, BE IT RESOLVED that the Town Council of the Town of Tiburon does hereby adopt a revised fee schedule for the Town Engineer and Public Works Department staff, said fee schedule being attached hereto as Exhibit A, said fee schedule to become effective 60 days from the passage of this resolution and to supersede the fee schedule set forth in Exhibit A of Resolution No. 06-2007. PASSED AND ADOPTED at the regular meeting of the Town Council of the Town of Tiburon on January 16, 2008 by the following vote: AYES: COUNCILMEMBERS: Berger, Collins, Fredericks, Slavitz NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: Gram ,/~ ~ Town Council Resolution No. 07-2008 Effective 03\17\2008 Page 1 EXIDBIT A TOWN ENGlNEER/PUBLIC WORKS DEPARTMENT FEE SCHEDULE (Effective 03/17/2008) The Town Engineer's application review fee includes the time spent by the Town Engineer and his staff to make one (1) site inspection, an initial review of submitted plans and maps for completeness, a second review of the submitted plans and maps, a consultation with Community Development Department staff and preparation of written conditions and/or recommendations. The Town Engineer's fee for additional work beyond that specified above, and for other applications where a specific fee is not listed, will be based on the actual time spent by the Town Engineer or his staff in accordance with the Town Engineer's personnel schedule. Where not otherwise indicated, the Town Engineer will determine a fee ifreview is determined to be necessary by the Director of Community Development or Building Official. Town Engineer's fees are as follows: A. Planning & Zoning Applications 1. Conditional Use Permit (Major)............. ...... ......... .......................................................... $1,600.00* 2. Precise Development Plan............................................................................................... $2,500.00* 3. Conceptual Master Plan...... ....... ............ .............. ........... .................................... ....... ..... $1,000.00* 4. Traffic Study Review................ .......... .... ........... ......................... ......................... ....... .... $1,000.00* B. Site Plan and Architectural Review Application Referral (complex applications only) 1. Design Review application.... ............... ..... ..... ..... .... ...... ......... ....... .................................. $450.00* 2. New Residence or Non-Residential Building ................................................................. $750.00* 3. Grading, Filling or Earthwork.. ........ .... ...... ........ ........... ..... .... ... ...... ....... ..... ..... ... ...... ...... $1,000.00* C. Subdivisions and Related Permits and Services 1. Tentative Map Application, Where Final Map Required................................................ $5,325.00* 2. Tentative Map Application, Where Parcel Map Required .............................................. $1,700.00* 3. Final Map ................................................ .............. ....... .................. ................................. $5,325.00* 4. Parcel Map ..... ....... .............. ....................... .... ......... .......... .............................................. $5,325.00* 5. Subdivision Improvement Plan Review.. ..... ......... ............................................... ........... $5,325.00* 6. Field Inspection.... ............... .............. ............ ..... ...................... 3% of the Value of Improvements D. Building Permit Drainage & Site Review Application 1. New Building .......... .............................. ......... .......... ...................................................... $500.00 2. Exterior AdditionlRemodel...................... .......... .... ........................................... .............. $350.00 E. Encroachment Permit 1. Application Processing Fee (applies to all Encroachment Permits)................................ $85.00** 2. Debris Box-only Encroachment Permit Inspection Fee .................................................. $75.00 3. Minor Encroachment Permit Inspection Fee................................................................... $150.00 (e.g., driveway approaches, curb drains, fences, paving or concrete work less than 175 sq. ft.) 4. Major Encroachment Permit Inspection and Plan Review Fee: 3% of Valuation of Improvements 5. All other Encroachment Permit applications, in the reasonable discretion of the Town Engineer, are subject to a $325.00** minimum deposit, and additional fees may be assessed based on actual processing time and adopted hourly rate schedules. *Fee shall be considered an initial non-refundable deposit. Additional fees may be required if actual time spent by Town Engineer or Deputy Town Engineer exceeds this fee. **Includes $25 Technology Recovery Fee. Town Council Resolution No. 07-2008 Effective 03\ 17\2008 Page 2