HomeMy WebLinkAboutTC Res 1991-02-20 (2)
RESOLUTION NO. 2764
A RESOLUTION OF THE TOWN COUNCIL OF
THE TOWN OF TIBURON SUPERSEDING RESOLUTIONS
NO. 2536, 2717, 2722 AND 2753
AND ADOPTING A REVISED COMMUNIlY DEVELOPMENT
DEPARTMENT FEE SCHEDULE
WHEREAS, the Tiburon Municipal Code requires that any changes to the
Department of Community Development's filing and processing fees be set forth by
Resolution of the Town Council; and
WHEREAS, in Resolution No. 2753 the Town Council incorporated the
provisions of AB 3158 which imposes new state processing fees on negative
declarations and environmental impact reports required by CEQA; and
WHEREAS, since adoption of Resolution No. 2753 the Department of Fish
and Game has adopted regulations clarifying that the AB 3158 fees should not be
imposed when the City finds no evidence of a potential adverse effect on fish or
wildlife; and
WHEREAS, the current fee schedule does not clearly reflect the intent of the
Town council that building permit fees are based on the actual value of construction
and not merely the minimum value established by the schedule.
NOW, THEREFORE, BE IT RESOLVED by the Town Council of the Town
of Tiburon that a new Community Development Fee Schedule (attached hereto and
incorporated by reference) is adopted with changes clarifying building permit fees
and AB 3158 environmental processing fees.
PASSED AND ADOPTED at a regular meeting of the Town Council of the
Town of Tiburon on February 20, 1991, by the following vote:
AYES: COUNCILMEMBERS: Friedman, Coxhead, Thayer, Kuhn, Logan
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
ATTEST:
I~ I.~'
-1' ',-+-; -: i/\"; ,/'"', ...//
~/0L.l',-- ~..\.;j~/,t\...\-.. -.
PETER B. LOGAN, MAYOR
\-,'
~~.~~
TIIERESE M. H NNESSY, TO .. LERK
EXHIBIT A: BUILDING FEES
BUILDING PERMIT FEE
The Building Permit Fee for all single or multi-family units
shall be based on the actual value of the construction but in no
case shall the fee be less than that listed in the Building
Valuation Chart:
1.
Apartment Houses:
Type I or II F.R.
Type V - Masonry (or Type III)
Type V - Wood Frame
Type I Garage
l42.50jsq. ft.
l14.50jsq. ft.
110.10jsq. ft.
58.40jsq. ft.
2.
Dwellings:
Type V-Masonry
Type V -Wood Frame
Garage
130.60jsq. ft.
125.00jsq. ft.
30.00jsq. ft.
The initial fee may be based on the Valuation Chart but may be
adjusted later to reflect actual value.
Buildinq Valuation Supplements: The following occupancies and
types are not covered in the Building Valuation Data in the
International Conference of Building Officials (ICBO) Building
Standards. The Building Permit Fee is as follows:
1. Sprinklered Structure (retrofits only)
3.00jsq.ft.
37.50jsq.ft.
5.00jsq.ft.
l5.00jsq.ft.
2. Tenant Improvements - Commercial
3. Block Walls & Pilasters (includes footings)
4. Retaining Walls (includes footings)
5. Retaining Walls (wood)
6. Greenhouse
5.00jsq.ft.
10.00jsq.ft.
l2.00jsq.ft.
9.00jsq.ft.
7. Patio, Solid Cover
8. Patio, Lattice Cover
9. Aluminum Patio Enclosure
50.00jsq.ft.
10. Deck
10.00jsq.ft.
11. Demolition
100.00
12. Re-roof:
Project value is to be substantiated by providing contract;
Building Permit fee is determined from the Project Valuation
Schedule, which begins on the next page.
1
13. Swimming Pool/Spa/Hot Tub:
Project value is to be substantiated by providing contract;
Building Permit fee is determined from the Project Valuation
Schedule.
14. Miscellaneous Work:
Building Permit fee for any work not covered under the
Building Permit fees listed in either the Building Valuation
Chart or the Building Valuation Supplement is to be
determined from the Project Valuation Schedule, which begins
on the next page. Project value is to be substantiated by
providing the contract.
2
Project Valuation Schedule Continued
PROJECT $ PERMIT PLAN CHECK STRONG MOTION
VALUATION FEE FEE FEE
200K-205K 1007.00 654.55 14.35
l 205K-210K 1024.50 665.93 14.70
210K-215K 1042.00 677.30 15.05 ...,.
215K-220K 1059.50 688.68 15.40
220K-225K 1077.00 700.05 15.75
225K-230K 1094.50 711.43 16.10
230K-235K 1112.00 722.80 16.45
235K-240K 1129.50 734. 18 16.80
240K-245K 1147.00 745.55 17.15
245K-250K 1164.50 756.93 17.50
250K-255K 1182.00 768.30 17.85
255K-260K 1199.50 779.68 18.20
. 260K -265K 1217.00 791 . 05 18.55
265K-270K 1234.50 802.43 18.90
270K-275K 1252".00 813.80 19.25
275K-280K 1269.50 825. 15 19.60
280K-285K 1287.00 836.55 19.95
285K-290K 1304.50 847.93 20.30
290K-295K 1322.00' 859.30 20.65
295K-300K 1339.50 870-.68 21 . 00
300K-305K 1357.00 882.05. 21.35
305K-310K 1374.50 893.43 21.70
310K-315K 1392.00 904.80 22.05
315K-320K 1409.50 916.18 22.40
320K-325K 1427.00 927.55 22.75
- 325K-330K 1444!40 938.93 23. 10
,
330K-335K 1462.00 950.30 23.45
335K-340K 1479.50 961 .68 23.80
340K-345K 1497.00 973.05 24 . 15
345K-350K 1514.50 984.43 24.50
3501<-355K 1532.00 995.80 24.85
355K-360t< 15~9.50 1007.18 25.20 ONLY APPROXIMATE:
360K-365K 1567.00 1018.55 25.55 USE FORMULA LISTED
3651<-370K 1584.50 1029.93 25.90 ON PREVIOUS PAGE
370K-375K 1602.00 1041 .30 2.6 . 25 USING EXACT PROJECT
375K-380K 1619.50 1052.68 26.60 VALUATION
380K -3851< 1637.00 1064.05 26.95
385K-390K 1654.50 1075.43 27.30
390K-395K 1672.00 1086.80 27.65
3951< -400K 1689.50 1095.00 28.00
400K-410K 1724.50 1120.93 28.70
410K-420K 1 759~ 50 1143.68 29.40
420K-430K 1794.50 1166.43 30. 10
430K-440K 1829.50 1189.18 30.80
440K-450K 1864.50 1211.93 31.50
450K-460K 1899.50 1234.68 3~ ;20
460K-470K 1934.50 1257.43 32.90
470K-480K 1969.50 1280.18 33.60
480K-490K 2004.50 1302.93 34.30
r 490K-500K 2039.50 1325.68 35.00
\..500K-51OK 2069.50 1345.18 35.70
510K-520K 2099.50 1364.66 36.40
520K-530K 2129.50 1384 . 18 37 . 10
530K-540K 2159.50 1403.68 37.80
3
Project Valuation Schedule Continued
PROJECT $ PERMIT PLAN CHECK
VALUATION FEE FEE
881<-89K 590.00 383.50 6.23
89K-90K 594.50 386.43 6.30
90K-91K 599.00 389.35 6.37
91K-92K 603.50 392.28 6.44 I
92K-93K 608.00 395.20 6.51
93K-94K 612.50 398. 13 6.58
941< -95K 617.00 401 .05 6.65
95K-96K 621 . 50 403.98 6.72
96K-97K 626.00 406.90 6.79
97K-98K 630.50 409.83 6.86
98K-99K 635.00 412.74 6.93
99K-100K 639.50 415.68 7.00
100K-I01K ~_~3. 00 417.95 7.07
101K-102K 646.50 420.23 7.14
102K-I03K 650.00 422.50 7.21
103K-I04K 653.50 424.78 7.28
104K-I05k 657.00 427.05 7.35
105K-I06K 660.50 429.33 7.42
106K-I071< 664.00 431.60 7.49
107K-108K 667.50 433.88 7.56
108K-109K 671 .00 436. 15 7.63
109K-110K 674.50 438.43 7.70
110K-111K 678.00 440.71 7.77
l11K-112K 681.50 442.99 7.84
112K-1131< 685.00 445.27 7.91
113K-114K 688.50 447.55 7.98
114K-115K 692.00 449.85 8.05
116K-117K 695.50 452.11 8.12
11 7~< - 118K 702.50 456.67 8.26
118K-119K 706.00 458.95 8.33
1191<-120K 709.50 461.43 8.40 ONLY APPROXIMATE:
1201<-121K 713.00 463.51 8.47 USE FORMULA LISTED
121K-122K 716.50 465.79 8.54 ~ ON PREVIOUS PAGE
122K-123K 720.00 468.07 8.61 USING EXACT PROJECT
123K-124K 723.50 470.35 8.68 VALUATION
124K-125K 727.00 472.63 8.75
125K-130K 744.50 483.93 9.10 J
130K-135K 762.00 495.30 9.45
135K-140K 779.50 506.68 9.80
140K-145K 797.00 518.05 10.15
145K-150K 814.50 529.45 10.50
150K-155K 832.00 540.80 10.85
1551(-160K 849.50 552.18 11.20
160K-165K 867.00 563.55 11.50
165K-170K 884.50 574.93 11.90
170K-175K 902.00 586.30 12.25
175K-180K 919.50 597.68 12.60
180k-185K 937.00 609.05 12.95
l 185K-190K 954.50 620.43 13.30
190K-195K 972.00 631 .80 13.65
195K-200K 989.50 643.18 14.00
4
PROJECT VALUATION SCHEDULE
J PROJECT PERMIT PLAN CHECK STRONG
~_~~~~~IIQ~_____Ess________Ess__________~QIIQ~_Ess
.,
$1-500 25.00 9.75 .50
501-600 25.00 11.05 .50
601-700 25.00 12.35 .50
701-800 25.00 13.65 .50
801-900 25.00 14.95 .50
901-1000 25.00 16.25 .50
1001-1100 27.00 17.55 .50
1101-1200 29.00 18.85 .50
1201-1300 31.00 20 . 15 .50
1301-1400 33.00 21 .45 .50
1401-1500 35.00 22.75 .50
1501-1600 37.00 24.05 .50
1601-1700 39.00 25.35 .50
1701-1800 41 . 00 26.65 .50
1801-1900 43.00 27.95 .50
1901-2000 45.00 29.25 .50
2001-3000 54.00 35. 10 .50
3001-4000 63.00 40.95 .50
4001-5000 72.00 46.80 .50
5001-6000 81 . 00 52.65 .50
I 6001-7000 90.00 58.50 .50
J 7001-8000 99.00 64.35 .50
8001-9000 108.00 70.20
'9001-10.000 117.00 76.05 STRONG f"IOT I ON
10K-I1K 126.00 81.90 FEE - Use Formula:
llK-12K 135.00 87.75 Residential .00007
12K-131< 144.00- 93.60 Commercial .00015
13K-14K 153.00 99.00
14K-15K 162.00 105.30
15K-16K 171.00 111.15
16K-17K 180.00 117.00
17K-18K 189.00 122.85
18K-19K 198.00 128.70
19K-20K 207.00 134.55
20K-21K 216.00 140.40
21K-22K 225.00 146.25
22K-23K 234.00 152. 10
23K-24K 243.00 157.95
24K-25K 252.00 163.80
25K-26K 258.50 168.03
26K-27K 265.00 172.25
27K-28K 271 .50 176.48
28K-29K 278.00 180.70
29K-30K 284.56 184.93'-
30K-31K 291 . 00 189. 15
31K-32K 297.50 193~38
32K-33K 304.00 197.60
33K-34K 310.50 201 .83
6
Project Valuation Schedule Continued
PROJECT $ PERMIT PLAN CHECK STRONG MOTION
J V ALUAT ION FEE FEE PEE
540K-550K 2189.50 1423.18 38.50
550K -5601( 2219.50 1442.68 39.20 )
560K-570K 2249.50 1462.18 39.90
570K-580K 2279.50 1481 .68 40.60
580K-590K 2309.50 1501 . 18 41 . 60
590K-600K 2339.50 1520.68 42.00
600K-620K 2399.50 1559.68 43.40
620K -6401( 2459.50 1598.68 44.80
640K-660K 2579.50 1637.68 46.20
660K-680K 2579.50 1676.68 47.60
680K-700K 2639.50 1715.68 49.00
700K-720K 2699.50 1754.68 50.40
720K-740K 2759.50 1793.68 51 . 80
740K-760K 2819.50 1832.68 53.20
760K-780K 2879.50 1871 .68 54.60
780K-800K 2939.50 1910.68 56.00
800K-820K 2999.50 1949.68 57.40
820K-840K 3059.50 1988.68 58:80
840K-860K 3119.50 2027.68 60.20
860K-880K 3179.50 2066.68 61.60
880K-900K 3239.50 2105.68 63.00
900K-920K 3299.50 2144.68 64.40
-~-l ~- 920K-940K 3359.50 2183.68 65.80
I 940K-960K 3419.50 2222.68 67.20
, 960K-980K 3479.50 2261 .68 68.00
980K-IM 3539.50 2300.68 70.00
1 Million and up: 3539.50 for first $1,000.000 plus $2.00 for each
additional $1000 or fraction thereof.
PLAN CHECK FEE IS 65% OF BUILDING PERMIT FEE
I
7
MISCELLANEOUS FEES
1. Plan storage fees:
Valuation
0-$100,000
$100,000-200,000
$200,000 -800,000
$800,000 -over
$25.00
$50.00
$75.00
$100.00
2.
Residential Resale Inspection for
Residential Building Report (RBR)
$150.00
$75.00
3.
Residential Resale Re-inspection:
4. Business License: Project value $0-$5000 is $15.00; Project
value $5001-$25,000 is $25.00; Projects valued over $25,000
is .0012 of the Project value.
5. Plan Checking fees: All construction plans must be checked
for conformance with state and Town regulations. A plan
checking fee shall be paid to the Town along with submittal
of construction drawings and specifications for review.
Plan checking fees shall be 65% of the building permit fees.
Where plans are incomplete, or changed so as to require an
additional plan check review, an additional plan review fee
shall be charged by the Town at $50.00 per hour with a
minimum charge of one hour.
6. Fees for Work Commenced without Permit:
a) Permit - Investigative Fee:
$250.00
A person who starts any work for which a permit is required
and who does not have a valid permit for that work is
charged an investigative fee as stated in Municipal Code
Title IV (Land Improvement and Use), Chapter 13 (Building),
section 13-3 (Permits - Investigative Fee). This fee is set
at $250.00 by Ordinance No. 354 N.S..
b) Permit - Penalty Fee:
In addition to the investigative fee, a person who starts
any work for which a permit is required without first having
obtained a permit shall, if later issued a permit, pay a
penalty not to exceed four (4) times the permit fee.
However, this provision does not apply to emergency work if
the Building Official or Chief Building Inspector determines
that such work was urgently necessary and that it was not
practical to obtain a permit before starting work.
8
7. Other Inspections and Fees:
a) Inspections outside of normal
business hours (minimum charge
is 2 hours)
$50/hour
b) Re-inspection fees assessed under
provisions of section 305(g) of the UBC
$75.00
c) Inspections for which no fee is
specifically indicated:
$50.00
d) Additional plan review required by changes, additions or
revisions is $50.00 or the total hourly cost to the
Town, whichever is the greatest. This cost shall include
supervision, overhead, equipment, hourly wages and
fringe benefits of the employees involved. One hour
minimum.
ELECTRICAL PERMIT FEES
Any fees required by this division shall be paid by the applicant
before any electrical work, requiring a permit hereunder, is
stated and the permit issued.
Minimum Fee: The minimum fee for any electrical permit,
unless otherwise indicated is $25.00
Miscellaneous Permit Fee: Any permit for miscellaneous
electrical work not in conjunction with a building permit,
and not itemized below, shall be a minimum fee of $25.00, or
2% of the contract cost, whichever is greater.
New Service or Service Change: Any permit for new service
or change of service not in conjunction with a building
permit shall be charged as follows:
000-100 amps
100-1000 amps
1000 amps & up
$50.00
$150.00
$250.00
Residential Dwelling: For each electrical permit for a "one
or two family unit, or a multi-family dwelling unit, the fee
shall be based on 20% of the building permit fee, inclusive
of carports and garages, inclusive of additions and
alterations.
Temporary Power Poles: The fee for electric power pole
distribution for construction sites, structures, or
facilities is as follows:
0-200 amps
over 200 amps
$50.00
$70.00
Air Conditioning: The electric hook up fee for the addition
of a central A/C cooling system to an existing dwelling
unit, connected to an existing electrical system is $25.00.
9
MECHANICAL PERMIT FEES
Any fee required by this division shall be paid by the applicant
before any mechanical work requiring a permit hereunder is
started and the permit is issued.
Minimum Fee: The minimum fee for any mechanical permit,
unless otherwise indicated, is $25.00.
Miscellaneous Permit Fee: Any permit for miscellaneous
mechanical work not in conjunction with a building permit,
and not itemized below shall be a fee of $25.00 or 1% of the
contract cost.
Residential Dwellings: For each mechanical permit for a one
or two family dwelling unit or a multi-family dwelling unit,
the fee shall be based on 9% of building permit fee,
inclusive of additions and alterations.
Commercial: Fees for commercial including retail stores,
offices, motels, in conjunction with a building permit are
as follows:
Office
Retail sales
Food Markets
Restaurants
9% of building permit fee
9% of building permit fee
12% of building permit fee
12% of building permit fee
Minimum Fee: The minimum fee in all of the above is $25.00.
Percentages over $25.00 follow the above schedule.
PLUMBING PERMIT FEES
Any fees required by this division shall be paid by the applicant
before any plumbing work requiring a permit hereunder is started
and the permit issued.
Minimum Fee: The minimum fee for any plumbing permit is
$25.00, unless otherwise stated.
Miscellaneous Permit Fee: Any permit for miscellaneous
plumbing work not in conjunction with a building permit, and
not itemized below, shall be a fee of $25.00 or 1.5% of the
contract cost, whichever is greater.
Residential Dwellings: For each plumbing permit for a one or
two family dwelling unit or a multi-family unit, the fee
shall be based on 10% of the building permit fee, inclusive
of additions and alterations.
Commercial: Plumbing Permit Fees for commercial or
industrial work (including retail stores, offices, motels)
in conjunction with a building permit are as follows:
Office 10% of building permit fees
Retail sales 10% of building permit fees
Food markets 10% of building permit fees
Restaurants 15% of building permit fees
10
GRADING PERMIT FEE SCHEDULE
Plan Check Fees:
50 cubic yards
100 cubic yards
1000 cubic yards
10,000 cubic yards
No fee
$15.00
$22.50
$30.00
Each additional 10,000 Cubic Yards
to 100,000 Cubic Yards:
$15.00
Permit Fees:
1 - 50 C.Y.
51 - 100 C.Y.
101 - 200 C.Y.
201 - 300 C.Y.
301 - 400 C.Y.
401 - 500 C.Y.
501 - 600 C.Y.
601 - 700 C.Y.
701 - 800 C.Y.
801 - 900 C.Y.
901 - 1000 C.Y.
1001 - 2000 C.Y.
2001 - 3000 C.Y.
3001 - 4000 C.Y.
4001 - 5000 C.Y.
5001 - 6000 C.Y.
6001 - 7000 C.Y.
7001 - 8000 C.Y.
8001 - 9000 C.Y.
9001 - 10,000 C.Y.
$15.00
$22.50
$33.00
$43.50
$54.00
$64.50
$75.00
$85.50
$96.00
$106.50
$117.00
$126.00
$135.00
$144.00
$153.00
$162.00
$171.00
$180.00
$189.00
$198.,00
Each additional 10,000 Cubic Yards is:
$40.50
ENCROACHMENT PERMIT (issued by Public Works):
$ 50.00
TIBURON BOULEVARD IMPROVEMENT FUND
(if not paid at the time of the final or parcel map for the"
land division): $1,974/unit.
11
EXHIBIT B: PLANNING FEES
CATEGORY 1: PERMITS
PLANNING/ZONING PERMITS:
1. General Plan Amendment $850
2. Rezoning/Prezoning $750
3. Zoning Text Amendment $750
4. Precise Development Plan - $2,000 + $100 each unit
5. Conceptual Master Plan - 1/2 fee for Precise Dev. Plan
6. Conditional Use Permit $500
7. Condominium Conversion Use Permit
14 Units or less: $400 + $25/unit
5 Units or more: $400 + $50/unit
8. Home Occupation Permit $25
9. Tree Alteration/Removal Permit $25
10. Mar West Parking Permits (Resolution No. 2560) $25
11. Sign Permit $50
12. Variance $200
13. Appeal $300
14. Amendment/Time Extension of Above Permit: One-half full fee
15. Single-lot Precise Development Plan Amendment $500
16. Unreasonable View Obstruction Complaint $500
SITE PLAN & ARCHITECTURAL REVIEW PERMITS:
17. Existing Building
Consent Calendar:
Minor Exterior Alteration of less than
400 sq. ft. and with neighbors' signatu:r'es;
includes CEQA exemption
$100
Minor Design Review of between 400 sq. ft. and
800 sq. ft. or without neighbors' signatures
$300
Major Design Review of over 800 sq. ft.
$500
Amendment to remodel or addition:
(unless a Consent Calendar item)
1/2 original fee
18. New Residence or New Non-Residential Building
Initial Approval
$1,500
Minor Amendment involving no new floor area
or significant design changes
$300
Major Amendment involving increased floor area
and/or significant design changes
$750
19. Grading, Filling, or Earthwork Requiring Review
$500
12
LAND DIVISION & RELATED PERMITS:
20. Lot Line Adjustment
$250
$750
$125
21. Reversion to Acreage
22. certificate of Compliance
23. Tentative Map
4 lots or less:
5 lots or more:
$400 + $lOO/lot/unit
$500 + $lOO/lot/unit
24. Vesting Tentative Map
4 lots or less:
5 lots or more:
$500 + $150/lot/unit
$700 + $150/lot/unit
25. Parcel/Final Map
4 lots or less:
5 lots or more:
$400 + $ 50/lot/unit
$500 + $ 50/lot/unit
26. Engineer Check of Plans/Drawings
Actual Cost
27. Engineer Inspections
3% of Estimated
Construction Costs
28. Extension/Amendment
1/2 of full filing fee
CATEGORY 2: ENVIRONMENTAL CLEARANCE
1.
Determination of CEQA Exemption
$25
2.
Initial Study & Negative Declaration
$1,750
3 .
EIR (full or focused)
actual preparation costs by EIR
Consultant chosen by the Town.
$1,850 +
NOTE:
The portions of these fees required by AB 3158 shall be
paid unless Town Staff determines that there is no -
evidence that the project will have a potential adverse
effect on fish and wildlife.
CATEGORY 3: ADMINISTRATIVE SERVICES
General
1.
Noticing of Applications
(Collected for most applications)
$75
2.
Plan/Document storage Fee
(Collected for most applications)
$25
3.
Photocopies
. 25/page
13
Documents
4. General Plan (All Elements)
5. General Plan (Individual Elements)
$25
6. Zoning Ordinance
$5
$25
$15
$5
$5
7. Subdivision Ordinance
8. Sign Ordinance
9. Tree and View Ordinance
10. Municipal Code
$100
Maps
11. General Plan Proposed Land Use Diagram (24" by 30") $2
12. Other General Plan Diagrams (11" by 17") $1
13. Zoning Map (24" by 30") $2
14. Planned Development Map (24" by 30") $2
15. Tiburon Base Map with street Names & Parcel Lines $2
( 24 II by 3 0 II )
16. Tiburon Base Map with street Names and Parcel Lines $4
(60" by 42")
17. Aerial Photo with Topographic Overlay (60" by 36") $5
(Based on 1975 Aerial Photo)
CATEGORY 4: PUBLIC FACILITY FEES
1. Tiburon Boulevard Improvement Fund:
All new residential development
All new retail development
All new office/other non-residential
$1,974/unit
$10.44/sq. ft.
$4.12/sq. ft.
2.
In -lieu housing fees:
As determined in Zoning
Ordinance
3 .
Park and Recreation in-lieu fees:
unit
$500/lot or
14
CATEGORY 5: DEVELOPMENT AGREEMENT FEE
$5,000 deposit, of which $2,500 is a non-refundable planning fee.
The remaining $2,500 will be used to offset the actual time spent
by the Town Attorney and Town Engineer at cost. If actual Town
Attorney and Town Engineer expense is more than $2,500, the
applicant shall pay the difference prior to approval of the
Development Agreement. If actual Town Attorney and Town Engineer
expense is less than $2,500, the difference will be returned to
the applicant.
CATEGORY 6: ASSESSMENT DISTRICT FEE
1.
Total Assessment under $500,000:
$250 + fee below
2.
Total Assessment $500,000-$2,500,000:
$500 + fee below
3.
Total Assessment $2,500,001 or more:
$750 + fee below
In addition to the above fees, the actual time spent by the Town
Attorney and Town Engineer will be billed at cost, with payment
required prior to approval of the assessment district.
CATEGORY 7: TOWN ATTORNEY/TOWN ENGINEER FEES
Appropriate fees shall be charged for applications regarding
planning, subdivision or other matters requiring submission to
the Town's professional staff (Town Attorney or Town Engineer)
for an opinion or research, and not covered by any other fee
schedule, at cost. At the application stage, the applicant shall
sign an "Agreement and Authorization to Proceed For Professional
Services of Town Engineer", which authorizes the Town Engineer to
provide services and obligates the applicant to pay the Town
Engineer directly for services rendered according to the fee
schedule. stated in the agreement.
CATEGORY 8: FEES IMPOSED BY OTHER GOVERNMENTAL ENTITIES
Any and all fees imposed by other governmental agencies (such as
the state or county) on development projects shall be payable by
the applicant.
15