Loading...
HomeMy WebLinkAboutAgr 2002-01-16 (CommAir) 1320 Industrial Avenue, Suite E Lie. #233345 Petaluma, CA 94952 (707) 765-8525 · Fax (707) 765-8530 (800) 300-8525 email: mriehman@abm.eom a subsidiary of IN!IM Industries Inc Mark Hlenman Project Engineer -==-=--~ Ca...... Mechania:;W,r Services Cam"ir Mechanical Services DATE: 11/28/01 1320 Industrial Avenue, Suite E Petaluma, CA 94952 Telephone: (707) 765-8525 (800) 300-8525 Facsimile: (707) 765-8530 License #233345 If 0/ ATTENTION: PROPOSAL SUBMITTED TO: STREET: CITY, STATE AND ZIP: Tony E. Iacopi Town ofTiburon - Public Works Dept. 1505 Tiburon Boulevard Tiburon, CA 94920 RE: The Tiburon Town Hall WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: performing a thorough evaluation of both the design and the operating condition ofHV AC systems AH-2 and AH-3 to determine why these systems have not maintained comfortable conditions in the building. AH-3 is a single zone heating/cooling system that serves the Council Chambers. We will verify the proper operation of the heating, cooling and exhaust components, review both the temperature control system and the economizer system design and verify proper operation, perform preventive maintenance tasks as we encounter a need for such work, measure supply, return and exhaust air flows, check for installation problems with the duct furnace, and make recommendations for needed repairs and/or system modifications. AH-2 serves 3 zones on the 2nd floor and has been retrofitted from a heating only system to a cooling system with zone reheat. Gas duct furnaces serve as the reheat device on 2 zones and an electric duct heater is the reheat device for the 3rd zone. The above work description for AH-3 will also apply to this system. However, because there are no temperature control system design drawings or sequence of operation for us to review, more time will have to be spent establishing how system components are currently being controlled. While AH-l, which serves the 1st floor office areas, is similar to AH-2, it is more complicated because it consists of 6 zones. We feel it is more cost effective to "learn" on AH-2. What we learn about AH-2's control system should directly apply to AH-l. WE PROPOSE to furnish material and labor in accordance with the above sPecifications for a sum not to exceed $4,200.00, based on performing all work during normal working hours. It is difficuh to predict what problems we will encounter. If our actual costs are less than we have anticipated, our in.AMill be reduced accordingly.~Mest project cost we would expect is approximately $3,000.00. PAYMENT to be made as follows: net 30 days upon completion. Labor Warranty: CommAir will provide the labor without charge to replace parts sold by CommAir that become defective within 30 days of date of installation. Acceptance of Proposal: The prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified Payment will be made as outlined above. This Lv dayof ~~ 2002- a subsidiary of @IIIlndustries Incorporated ~.." ~~' ~ h7/ /1 ~/ BY~~~~~?~ TITLE: Itj En~r / BY:~ A"'" ~,u;'~~D-r'- , ~~ '..~"':a"'~r~fiUli~ ~'SI~~ ~~ ~------ t\NN DANFORTH TOV\tN ATTORNEY i- ,.,- T19~ ~OC\I t