This Agreement is date 2000, and is between the TOWN OF TIBURON a
municipal corporation, 1505 iburon Boulevard, Tiburon, CA 94920, ("Town"), and
Bruce Abbott, Sidsel Moller, Pamela Snellgrove, Simon Snellgrove, Nancy Peterson, Greg
Moore, and Susan Miglioli (collectively, "Homeowners").
Io Recitals.
A. Homeowners are the owners of properties located on Greenwood Beach Road, as
listed on Exhibit A. The Town is the owner of Greenwood Beach Road, those
open space parcels known as Assessor's Parcels Nos. 055-041-11, 05 5-041-12,
and 055-041-13 and a drainage easement running between said open space parcels
and Greenwood Beach Road, which easement is further described in Recital B.
B. Homeowners' properties are located generally between Greenwood Beach Road
and the above-described open space parcels, on the downhill side of a natural
watershed. The runoff from this watershed passes down the hill and into
Richardson Bay. The Existing Drainage System includes a channel that is located
in part on the Homeowners' properties and in part on Town-owned open space
("Existing Channel"). The Existing Drainage System also includes a pipe within a
Town-owned easement that runs from Greenwood Beach Road through 444
Greenwood Beach Road to the Existing Channel ("Drainage Easement").
C. The Existing Drainage System is inadequate to satisfactorily convey water runoff
into the Bay during periods of heavy rainfall, resulting in occasional flooding of the
Homeowners' properties.
D. The Homeowners have engaged CSW/Stuber-Stroeh, Engineering Group; Inc., a
design engineer, to design a project that would improve the current drainage
situation and have obtained all necessary state and federal permits (collectively,
"Agency Permits") required for the construction of the Project. The Project would
seal the existing Drainage Easement pipe, and reroute the water that now passes
GREENWOOD BEACH DRAINAGE IMPROVEMENT PROJECT
GREL 400D BEACH DRAINAGE
IMPROVEMENT" PROJECT
through that pipe to a pipe to be constructed on the easterly side of 458
Greenwood Beach Road ("New Drainage Easement"). The Project would relocate
the other drainage facilities currently on the Homeowners' properties onto public
land owned and controlled by the Town.
E. The Project involves a considerable amount of construction on Town property.
Accordingly, the Homeowners have asked the Town to arrange for the
construction of the Project as a public works project. Further, the Homeowners
have asked the Town to make a financial contribution to the cost of the project.
The Homeowners have committed to provide $45,000 to the Town for the
construction of the Project, plus $5000 to cover potential contingencies.
F. Because the Existing Drainage System lies both on public and private property and
includes a Town-held easement across private land, it poses unusual maintenance
problems for the Town and could result in substantial repair costs in the future.
The project would ameliorate these problems and allow the 'own to reconvey the
Drainage Easement to the Homeowners holding title to 444 Greenwood Beach
Road. Accordingly, the Town has agreed to contract for the construction of the
Project as a public works project and to contribute up to $50,000 (fifty thousand
dollars and no cents) to the Project subject to the terms and conditions set forth in
this Agreement. The Homeowners understand that, in the event that the cost of
constructing the Project exceeds the funds available for the Project, they may have
to elect between contributing further funds or abandoning the Project.
H. Agreement.
1. The Project shall be built according to the Plans by CSW/Stuber-Stroeh,
Engineering Group, Inc. Sheet No. 1 of the Plans is dated June 10, 1998, and
Sheet Nos. 2 and 3 are dated September 4, 1997 ("Plans"). Copies of the Plans
are on file at the Tiburon Town Hall and are incorporated herein by reference.
2. Prior to commencement of construction, Homeowners Bruce Abbott and Sidsel
Moller, owners of 458 Greenwood Beach Road, shall convey the New Drainage
Easement to the Town. The exact location and description of the New Drainage
Easement shall be as necessary to allow the Town to install and maintain the new
pipe described in Recital D and the Plans.
3. Upon completion of the Project, the Town shall quitclaim all right, title and
interest in (a) the Drainage Easement and the improvements located therein to the
GREENWOOD BEACH DRAINAGE IMPROVEMENT PROJECT
2
GREL OOD BEACH DRAINAGE
IMPROVEMENT PROJECT
Homeowners owning fee title to 444 Greenwood Beach Road; and (b) the Existing
Channel, to those Homeowners whose properties are traversed by said Channel.
Thereafter, the Town shall have no further interest in or responsibility for the
Existing Channel or the Drainage Easement and the improvements, such interest
and responsibilities having been transferred to said Homeowners. The Town shall
exclude from said conveyances any area covered by the New Drainage Easement.
4. The Project Budget is set forth in Exhibit C. The Total Project Cost is expected to
equal $119,334, plus a Contingency Allowance of $10,000. The Total Project
Cost includes $19,576 already expended by the Homeowners for design
engineering services. Accordingly, the actual construction of the Project is
estimated to cost $99,758 ("Estimate"). The Marin County Flood Control District
("District") has agreed to contribute $10,000 ("District Contribution"). The Town
has agreed to contribute $50,000 ("Town Contribution"). All remaining Project
costs shall be borne by the Homeowners. The respective responsibilities of the
Homeowners for payment of Project Costs as set forth in the Project Budget is set
forth in Exhibit C.
5. As soon as practicable after the execution of this Agreement, the Town shall select
a contractor to construct the Project as required by state law and local ordinance.
The Contract shall be bid as a fixed price contract. The Town shall advise the
Homeowners of the date set for bid opening at least 10 days prior to said date. The
Homeowners may review the Contract Documents during the period between the
Town's advertising for bids and the bid opening and may be present at the bid
opening to review the bid packages. As soon as practicable after bid opening, the
Town shall advise the Homeowners' designated contact person of the amount of
the lowest responsive and responsible bid ("Contract Price"). Such notice may be
by telephone.
6. In the event that the Contract Price exceeds the Estimate by $10,000 or less
because of the condition of the Town-owned Greenwood Beach right of way
Town shall increase its Contribution to cover said overage. In the event that the
Contract Price exceeds the estimate for any other reason (or in the event that the
overage relates to the condition of the Greenwood Beach right of way and exceeds
$10,000), Homeowners may elect to abandon the Project rather than pay the
increased cost. Homeowners must exercise this election by giving Town written
notice thereof within ten (10) calendar days of receiving notice from the Town of
the actual Contract Price. If the Homeowners elect to abandon the Project, neither
they nor the Town shall have any further obligation to proceed with the project. If
GREENWOOD BEACH DRAINAGE IMPROVEMENT PROJECT
GRE~ CCD BEACH DRAINAGE
IMPROVEMENT PROJECT
the Homeowners decide that they are willing to proceed with the Project, they
shall deposit the Project funds as set forth in Paragraph 8 of this Agreement.
7. In the event that the Contract Price is less than the Estimate, the Town
Contribution shall be reduced by an amount such that the Town Contribution is
equal to 39% (thirty-nine percent) of the Contract Price ("Reduction"). However,
the Town Contribution may be re-adjusted to a maximum of $50,000 as provided
in Paragraph 10.
8. Within ten (10) calendar days of receiving notice of the Contract Price through
their designated contact person, Homeowners must deposit their share of the
anticipated Project costs with the Town, unless the Homeowners have exercised
their option to abandon the Project as provided in Paragraph 6. Said Deposit must
be in an amount such that the sum of the Deposit and the District and Town
Contributions equals the amount of the Contract Price plus a contingency of
$10,000.
9. After the Town has received the Deposit required by Paragraph 8, the Town shall
award the contract to the lowest responsive and responsible bidder. As soon as
practicable after award, the Town will issue to the successful contractor a Notice
to Proceed with construction of the Project as a public works project, under the
oversight of the Town that is normal and usual for such projects.
10. In the event that the Town has reduced the Town Contribution pursuant to
Paragraph 7, but the actual cost of constructing the Project ("Actual Construction
Cost") exceeds the Contract Price, the Town shall increase its Contribution by
one-half of the overage. However, in no event shall this increase exceed the
Reduction. The Town shall not be obliged to continue with the Project if the
Actual Construction Cost exceeds the sum of the Town Contribution, the District
Contribution and the funds to be contributed by the Homeowners.
1 1. In the event that the Actual Construction Cost is less than the Contract Price, the
Town shall refund any remaining funds in the Deposit to the Homeowners in
proportion to their respective contributions. Further, in the event that some or all
of the Contingency Allowance remains after the completion of construction, the
Town shall refund one-half of the remaining allowance to Homeowners, in
proportion to their respective contributions.
GREENWOOD BEACH DRAINAGE LklPROVEMENT PROJECT
4
ORE. JOOD BEACH DRAINAGE
IMPROVEMENT PROJECT
12. In the event that, after commencement of construction, circumstances arise that
result in the likelihood that the Actual Construction Cost will exceed the funds
available pursuant to this Agreement, the Town will have sole discretion to
determine whether the overage is the responsibility of the Contractor. If the Town
determines that the overage is not the responsibility of the Contractor, the Town
will so advise the Homeowners and give them 10 calendar days to elect whether to
provide the necessary additional funds or abandon the Project. If the Homeowners
do not make such election within 10 calendar days, or having elected to proceed
with the project, do not provide the necessary additional funds within 15 calendar
days of receiving said notice from the Town, the Project shall be abandoned.
In the event of Project abandonment under this Paragraph, the Town shall pay the
Contractor all sums due under the Contract with the Town ("Abandonment
Cost"). The Town shall then calculate the amount of Deposit refund due the
Homeowners, if any, by determining the proportion that the Deposit required
under Paragraph 8 of this Agreement bears to the sum of the Contract Price and
the $10,000 Contingency Allowance ("Homeowners' Percentage"). The
Homeowners Percentage shall be applied to the Abandonment Cost and that
amount shall be deducted from the Deposit. The funds remaining in the Deposit, if
any, shall be returned to the Homeowners in the same proportions as their
Contributions thereto.
13. This Agreement applies to, inures to the benefit of and binds all parties hereto,
their heirs, legatees, devisees, administrators, executors, successors and assigns.
In the event that any Homeowner transfers any interest in their property, the rights
and duties under this agreement shall pass to said transferee and subsequent
transferees, if any, without modification.
14. This Agreement shall be governed by the laws of the State of California. In the
event of litigation between the parties relating to this'Agreement, the proper venue
therefor is the Marin County Superior Court.
GREENWOOD BEACH DRAINAGE IMPROVEMENT PROJECT
5
GRE` VOOD BEACH DRAINAGE
IMPROVEMENT PROJECT
1H. Exhibits.
This Agreement includes the following Exhibits, which are attached hereto and
incorporated herein by reference:
Exhibit A The Homeowners and the Properties
Exhibit B Project Budget
Exhibit C Homeowner Responsibilities
APPROVED AS TO FORM:
B
Y
own Attorney
TOWN OF TIDURON
By
own Manager
HOMEOWNERS. Brace Abbott
r\
Sidsel Moller
Pamela Snellgrove
Simon Snellgrove
Nancy Peterson
Greg Moore
Susan Miglioli
GREENWOOD BEACH DRAINAGE EVIPROVEMENT PROJECT
6
GRE JOOD BEACH DRAINAGE
IMPROVEMENT PROJECT
M. Exhibits.
This Agreement includes the following Exhibits, which are attached hereto and
incorporated herein by reference:
Exhibit A The Homeowners and the Properties
Exhibit B Project Budget
Exhibit C Homeowner Responsibilities
APPROVED AS TO FORM:
B
Y
own Attorney
TOWN OF TIBURON
By
Town Manager
HOMEOWNERS.
Bruce Abbott
Sid-se-1- Moller
A
Pamel Snellgrove
r
mon V,
Nancy Peterson
Greg Moore
Susan Miglioli
GREENWOOD BEACH DRAINAGE IMPROVEMENT PROJECT
6
GRE. JOOD BEACH DRAINAGE
IMPROVEMENT PROJECT
M. . Exhibits.
This Agreement includes the following Exhibits, which are attached hereto and
incorporated herein by reference:
Exhibit A
Exhibit B
Exhibit C
APPROVED AS TO FORM:
By AGO
wn Attorney
HOMEOWNERS.
Bruce Abbott
Sidsel Moller
Pamela Snellgrove
The Homeowners and the Properties
Project Budget
Homeowner Responsibilities
TOWN OF TIBURON
By
own Manager
Simon Snellgrove
Nancy eterson
~ 116n-JL
Greg oore
Susan Miglioli
GREENWOOD BEACH DRAINAGE IMPROVEMENT PROJECT
6
GREG. JOOD BEACH DRAINAGE
IMPROVEMENT PROJECT
Exhibits.
This Agreement includes the following Exhibits, which are attached hereto and
incorporated herein by reference:
Exhibit A
Exhibit B
Exhibit C
APPROVED AS TO FORM:
By lj'~X (C_~
own Attorney
HOMEOWNERS.
Bruce Abbott
Sidsel Moller
Pamela Snellgrove
The Homeowners and the Properties
Project Budget
Homeowner Responsibilities
TOWN OF TIBURON
By
Town Manager
Simon Snellgrove
Nancy Peterson
Greg Moore
Susan Miglioli
GREENWOOD BEACH DRAINAGE IMPROVEMENT PROJECT
6
GREENWOOD BEACH DRAINAGE
IMPROVEMENT PROJECT
EXIMIT A _
THE HOMEOWNERS AND PROPERTIES
Homeowner Street Address of Property APN#
Bruce Abbot 458 Greenwood Beach 055 031 25
Sidsel Moller
Pamela Snellgrove 442 Greenwood Beach 055 031 12
Simon Snellgrove
Nancy Peterson 444 Greenwood Beach 055 031 29
Greg Moore
Susan Miglioli 448 Greenwood Beach 055-031-32
GREENWOOD BEACH DRAINAGE MROVEMENT PROJECT
7
i
Greenwood Beach Drainage
Budget
COSTS
Construction and Landscaping
Storm Drain Channel
Channel
Landscaping
Engineering and Contingency
Engineering
Contingency
REVENUE
Flood Control Zone 4
Property Owners
Engineering
Construction
Contingency
Town of Tiburon
Project
Contingency
Total Revenues
Original
Estimate
1993
Today's
Price
1999
26,300 28,456
37,100 50,293
- 21,009
63,400 99,758
9,510 19,576
9,510 10,000
19,020 29,576
$ 82,420 $ 129,334
$ 10,000
19,576
45,000
5,000
$ 69,576
45,000
5,000
$ 50,000
$ 129,576
8%
54%
39%
100%
11/2/99
Property owners are seeking additional estimates for the landscaping.
GREENWOOD BEACH DRAINAGE
IMPROVEMENT PROJECT
EXHIBIT C
HOMEOWNERS RESPONSIBILITIES
Homeowner(s)
Bruce Abbot
Sidsel Moller
Pamela Snellgrove
Simon Snellgrove
Nancy Peterson
Greg Moore
Susan Miglioli
Subtotal:
Contingency.-
Moore/Peterson
Snellgroves
Total Contingency
Engineering Costs (paid)
Total Homeowner Contribution
Flood Control Zone 4
Town Contribution:
TOTAL:
Approx. Payment of
Deposit per Paragraph 8
(based on Estimate)
$10,000
$13,000
$12,000
$101000
$45,000
$2000
$3000
$5000
$19,595
$69,595
$10,000
$50,000
$1291595
GREENWOOD BEACH DRAINAGE IMPROVEMENT PROJECT
9