HomeMy WebLinkAboutTC Res 2009-06-17 (12)RESOLUTION NO. 20-2009
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF TIBURON
ADOPTING A MITIGATED NEGATIVE DECLARATION AND ASSOCIATED
MITIGATION MONITORING PROGRAMS FOR THE SAFE ROUTES TO SCHOOL
(SR2S) AND NON-MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP)
IMPROVEMENT PROJECTS
WHEREAS, the Town Council of the Town of Tiburon does resolve as follows:
Section 1. Findings.
A. The Town of Tiburon is proposing to construct pedestrian improvements in the vicinity of
the Del Mar Middle School as well as make improvements to three existing paths located
at Raccoon Lane, Cayford Drive, and the pedestrian connector from Jefferson Drive to
Reed Ranch Road. The physical improvements associated with this program would take
place at twelve discontinuous locations throughout Tiburon and include sidewalk
widening, repainting and enhancing crosswalk striping, improving sidewalk ramps, and
improving paths and stairs. Said improvements are depicted on'drawings dated February
20, 2009 (8 sheets) for the SR2S project and October 15, 2008 (8 sheets) for the NTPP
project, both sets of drawings prepared by Harrison Engineering, Inc., and on file and
available for public review in the Tiburon Planning Division offices.
B. The Tiburon Planning Division prepared an initial study, which concluded that there
were no potentially significant environmental effects related to the project that could not
be mitigated through implementation of the mitigation measures agreed to in advance
by the Town.
C. On April 24, 2009, a Draft Mitigated Negative Declaration was circulated for public and
agency comment. Notices of such availability were mailed to persons and agencies as
required by law, posted, and advertised in the Ark newspaper to announce a public review
period that ended on May 27, 2009. The notice included information on the scheduled
public hearing on the project application. Two comment letters were received during the
comment period.
D. The Town Council finds that no substantial evidence has been received that would
support a fair argument that a significant environmental effect would result from the
project after implementation of the mitigation measures.
E. The Town Council finds that the Mitigated Negative Declaration reflects the Town
Council's independent judgment and analysis.
Tiburon Town Council Resolution No. 20-2009 June 17, 2009
F. The Town Council finds that the Custodian of Documents for the project is the Director
of Community Development for the Town of Tiburon, whose offices are located at 1505
Tiburon Boulevard, Tiburon, California.
Section 2. Adoption of Mitigated Negative Declaration.
NOW, THEREFORE, BE IT RESOLVED that the Town-Council adopts the Mitigated
Negative Declaration for the SR2S and NTPP projects.
Section 3. Approval of Mitigation Monitoring _Programs.
BE IT FURTHER RESOLVED that the Town Council hereby adopts mitigation
monitoring programs for each project, as set forth in attached Exhibits "1" and "2", both
incorporated herein. The Director of Community Development is directed to file the Notices of
Determination with the Marin County Clerk and the Governor's Office of Planning & Research
(State Clearinghouse) within five (5) working days of this approval.
PASSED AND ADOPTED at a regular meeting of the Town Council on June 17, 2009,
by the following vote:
AYES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
Berger, Collins, Fredericks, Slavitz
Gram
ALICE FREDERICKS, MAYOR
TOWN OF TIBURON
ATTEST:
DIAE CRANE IA P,TO CLERK
Attachments: Exhibit 1 MMP for SR2S
Exhibit 2 MMP for NTPP
Tiburon Town Council Resolution No. 20-2009 June 17, 2009 2
EXHIBIT 1
MITIGATION MONITORING PROGRAM
SAFE ROUTES TO SCHOOL (SR2S)
The mitigation measures required to reduce the potentially-significant impacts of the project to a
less-than-significant level are as follows:
Mitigation Measure Cultural -1: If, during construction activities, any archaeological artifacts or
human remains are encountered, the following measures shall be implemented:
a. Construction shall cease and a qualified archaeologist shall visit the site to address the
find. The Marin County Medical Examiner's office shall be notified to provide proper
direction on how to proceed. If M Native American resources are encountered during
construction, construction shall cease immediately a Native American descendant,
appointed by the Native American Heritage Commission of the State of California, is
able to evaluate the site, make further recommendations, and be involved in mitigation
planning.
b. Any artifacts or samples collected as part of the initial discovery or monitoring
must be properly conserved, catalogued, analyzed, evaluated, and curated in a
manner consistent with current professional archaeological standards.
C.. The project sponsor is responsible for notifying the contractor in writing of the
possibility of such findings and shall provide proof of this communication to the
Town Planning staff prior to the onset of construction.
Implementation Procedure:
Contractor or sub-contractor shall follow the mitigation procedure in the event that
archaeological artifacts or human remains are encountered during construction activities.
Non-Compliance Sanction:
Failure to comply with the mitigation procedure will result in stop work orders, fines, penalties,
and prosecution under applicable state and federal laws.
Mitigation Measure Noise -1: All construction activity shall comply with the Town's
limitations on construction hours as set forth in Chapter 13 of the Tiburon Municipal
Code. However, for this specific project there shall be no construction activities on
Saturday or Sunday.
Tiburon Town Council Resolution No. 20-2009 June 17, 2009 3
Implementation Procedure:
Ensure contractor or sub-contractor is aware of the Town's limited construction hours, including
those for use of heavy equipment. Building inspector shall ensure that these appear on the job
card. Building inspector and Police Department would enforce this measure.
Non-Compliance Sanction:
Police Department and/or Building Inspector to issue citations and/or halt construction.
Tiburon Town Council Resolution No. 20-2009 June 17, 2009 4
EXHIBIT 2
MITIGATION MONITORING PROGRAM
NON-MOTORIZED TRANSPORTATION PILOT PROGRAM (NTPP)
The mitigation measures required to reduce the potentially-significant impacts of the project to a
less-than-significant level are as follows:
Mitigation Measure Cultural -1: If, during construction activities, any archaeological artifacts or
human remains are encountered, the following measures shall be implemented:
d. Construction shall cease and a qualified archaeologist shall visit the site to address the
find. The Marin County Medical Examiner's office shall be notified to provide proper
direction on how to proceed. If any Native American resources are encountered duriconstruction, construction shall cease immediately until a Native American descendant,
appointed by the Native American Heritage Commission of the State of California, is
able to evaluate the site, make further recommendations, and be involved in mitigation
planning
e. Any artifacts or samples collected as part of the initial discovery or monitoring
must be properly conserved, catalogued, analyzed, evaluated, and curated in a
manner consistent with current professional archaeological standards.
f. The project sponsor is responsible for notifying the contractor in writing of the
possibility of such findings and shall provide proof of this communication to the
Town Planning staff prior to the onset of construction.
Implementation Procedure:
Contractor or sub-contractor shall follow the mitigation procedure in the event that
archaeological artifacts or human remains are encountered during construction activities.
Non-Compliance Sanction:
Failure to comply with the mitigation procedure will result in stop work orders, fines, penalties, }
and prosecution under applicable state and federal laws.
Miti!ation Measure Noise -1: All construction activity shall comply with the Town's
limitations on construction hours as set forth in Chapter 13 of the Tiburon Municipal
Code. However, for this specific project there shall be no construction activities on
Saturday or Sunday.
Tiburon Town Council Resolution No. 20-2009 June 17, 2009 5
Implementation Procedure:
Ensure contractor or sub-contractor is aware of the Town's limited construction hours, including
those for use of heavy equipment. Building inspector shall ensure that these appear on the job
card. Building inspector and Police Department would enforce this measure.
Non-Compliance Sanction:
Police Department and/or Building Inspector to issue citations and/or halt construction.
Tiburon Town Council Resolution No. 20-2009 June 17, 2009 6