December 8, 1999
SUBJECT: MEMORANDUM OF UNDERSTANDING -
MAIN STREET SEWER PIPELINE REPLACEMENT
Dear Skip:
Enclosed is a fully executed copy of the Memorandum of Understanding between
Sanitary District No. 5 and the Town of Tiburon for the Main Street Sewer Pipeline
Replacement Project.
Thanks for you cooperation in this matter.
Very y rs,
Diane Crane Iacopi
Town Clerk
Enclosure
cc: Town Manager
Town Attorney
Xc,, Town Engineer (w/copy of Agreement)
Original Agreement in Toi~na Agreement File
11
MEMORANDUM OF UNDERSTANDING
BETWEEN
SANITARY DISTRICT NO. 5 OF MARIN COUNTY
AND
TOWN OF TIBURON
FOR
MAIN STREET SEWER PIPELINE REPLACEMENT
THIS AGREEMENT is made on this 20th day of October, 1999 by and between
Sanitary District No. 5 of Marin County ("District") and the Town of Tiburon ("Town").
RECITALS
WHEREAS, the Town is in the process of planning to construct improvements
("Improvement Project") to a portion of Main Street in the Town of Tiburon between Upper
Main Street and Tiburon Boulevard, as more specifically shown on the attached map (referred
to herein as "Lower Main Street"), and the Town will be engaging a contractor to perform the
work.
WHEREAS, the District is in the process of planning to replace its underground sewer
pipeline located along and under Lower Main Street ("Pipeline Replacement Project").
WHEREAS, the District and the Town desire to construct the Improvement Project and
the Pipeline Replacement Project (collectively referred to as "Projects") at the same time to
complete the Projects more efficiently and economically, and to minimize the disruption of the
Projects on the businesses operating along Lower Main Street and the general public.
AGREEMENT
NOW, THEREFORE, the District and the Town agree.as follows:
1. District Responsibilities. The District shall do the following in connection
with this Agreement:
(a) Prepare Specifications for Sewer Pipeline Replacement. The District
shall prepare the technical specifications and drawings ("Sewer Specifications") for the
replacement of the sewer pipeline under Lower Main Street and shall provide final, complete
Sewer Specifications to the Town for inclusion in the bid package for the Improvement
Project.
(b) Oversee and Inspect the Pipeline Replacement Project. The District
shall oversee the work of the Town's contractor with regard to the Pipeline Replacement
Project during the construction of the work. The District shall inspect pipeline replacement
work to confirm that the contractor's work is completed and in full compliance with the Sewer
Specifications.
707706.2
(c) Pay for the Pipeline Replacement Project. The District shall pay all
costs associated solely with the construction of the Pipeline Replacement Project, including,
without limitation, the cost of materials, supplies, services, labor, overhead and profit
("Costs"). In addition, the District will pay fifty percent (50%) of the Costs of the following
items of trench surfacing work, which are Joint Costs associated with both Projects:
(i) 386 linear feet by 3 feet wide brick sidewalk, totaling 1,158
square feet
(ii) 42 linear feet of curb and gutter
(iii) 42 linear feet by 1.5-foot wide asphalt concrete overlay, totaling
63 square feet.
In the event that the Pipeline Replacement Project involves other Joint Cost
items of work that are also involved in the Improvement Project, the parties will share all
Costs associated with said work on an equal basis, unless the parties agree that a different
allocation of costs is equitable. The process for paying the District's share of the costs is set
forth in Section 2(c).
2. Town Responsibilities. The Town shall do the following in connection with
this Agreement:
(a) Incorporate Pipeline Replacement Project Specifications. The Town
shall incorporate the Sewer Specifications provided by the District into the specifications for
the Town's Improvement Project. The Town shall prepare a Bid Form that separately itemizes
all components of the Pipeline Replacement Project and all components of the Improvement
Project. Components of the Improvement Project in which the District will share (such as
paving, sidewalk installation, and curb and gutter installation) will be included in the
Improvement Project portion of the bid. The Town will provide the District with an
opportunity to review and comment on the form of these documents. Additionally, Town shall
prepare the special provisions for the Projects and shall provide the District with an
opportunity to review and edit the special provisions as mutually agreed to by the Town and
District. The Town shall provide in the contract documents that all provisions applicable to
the Improvement Project shall be equally applicable to the Pipeline Project. The Town also
shall require the contractor to provide warranties and indemnities for the Pipeline Project
directly to the District. The Town shall require its contractor to indemnify and defend the
District, its directors, officers, employees and agents for damage and injuries arising from the
contractor's work under the contract and to provide adequate insurance naming the District, its
directors, officers, employees and agents as additional insureds.
(b) Solicit Bids and Award Contract. The Town shall advertise the
contract, solicit bids and award the contract in full compliance with all applicable competitive
bidding laws. The Town shall give the District the opportunity to evaluate the bids and to
determine that it will not participate in the joint construction project if the bid for the Pipeline
Replacement Project unreasonably exceeds the District's estimate for the work.
2
707706.2
(c) Pay for the Improvement Project. The Town shall pay the contractor
for all costs pertaining to the Project. However, prior to the Town's payment to the contractor
for costs for which the District is solely or partially responsible, the Town shall request that
the District approve the invoice to confirm that the work for the Pipeline Replacement Project
has been satisfactorily completed. The District shall respond to the Town's request promptly.
The District shall reimburse the Town for all costs that are the responsibility of the District as
set forth in Section 1(c) of this Agreement as progress payment invoices are submitted to the
Town by the contractor. District shall pay all costs associated with the Pipeline Replacement
Project and its share of the joint costs. The District shall pay the Town such reimbursement
amount within twenty (20) days of District receipt of the progress payment invoice as
approved by the Town and District. The Town shall pay for all costs associated with the
Improvement Project, including the cost of materials, supplies, services, labor, overhead and
profit, and its proportionate share of all costs for work that affects the Projects.
(d) Change Orders. The Town and the District shall coordinate regarding
any necessary change orders for the Projects. All change orders for the Pipeline Replacement
Project shall be paid for by District, all change orders for the Improvement Project shall be
paid for by Town, and all change orders that affect both Projects shall be paid for equally by
the District and Town, unless the parties agree that a different allocation of costs is equitable.
(e) Claims. The Town shall administer any claims submitted by contractor.
The District shall reimburse the Town for all claims pertaining to the Pipeline Replacement
Project and for its share of claims pertaining to the work jointly affecting the Projects based on
the ratio established in Section 1(c).
3. Responsibilities of District and Town.
(a) Cooperation. The District and the Town shall cooperate with each
other in performing the services covered under this Agreement by, among other things,
keeping each other informed of the time lines for the Projects, sharing information applicable
to the Projects, and coordinating to enable each entity to perform the services required under
this Agreement.
(b) Indemnity. Each party shall indemnify, defend and hold harmless the
other party and their respective directors, council members, officers, employees and agents
from and against any and all claims of liability for injury or damage to persons or property
arising from negligent acts or omissions and willful misconduct caused by each entity in the
performance of services pursuant to this Agreement.
(c) Term. The term of this Agreement shall commence upon the date first
written above and shall terminate upon the end of the warranty period established in the
contract specifications, unless the District does not participate in the construction project
pursuant to Section 2(b) of this Agreement, in which case this Agreement shall terminate upon
District's election not to participate in the joint procurement.
3
707706.2
(d) Notices. Each party shall designate a representative to serve as the day-
to-day contact during the term of this Agreement. Unless otherwise notified in writing, the
District Manager shall serve as the District representative and the Town Manager shall serve
as the Town Representative. All written notices shall be sent to the addresses below:
District: Sanitary District No. 5 of Marin
2001 Paradise Drive
P.O. Box 227
Tiburon, CA 94920
Attn: District Manager
Town: Town of Tiburon
1505 Tiburon Blvd.
Tiburon, CA 94920
Attn: Town Manager
(e) Applicable Law. This Agreement shall be governed and construed in
accordance with the laws of the State of California.
IN WITNESS WHEREOF, the parties have executed this Agreement as of the day and
year first written above.
SANITARY DISTRICT NO. 5 OF MARIN
COUNTY
By
f
President, Board of Directors
ATTEST:
Secretary of the District
TOWN OF TIBURON
By:
Vice Mayor
ATTEST:
Town Clerk
4
707706.2
LOCATION MAP
EXHIBIT A
[Drawing of Main Street]
707706.2
rn
x
z
D
Y
~D
V~
I~
/7Y
7
I0
10
\R
~J
ST9
U~
jo,
0 c
0
z
❑ co
0
Ge Ori •
w ~ • ~ . 'Gtr ~ ❑
7