HomeMy WebLinkAboutAgr 1998-06-24 (Transworld Construction)ORIGINAL
TIBURON POLICE STATION
CONSTRUCTION PROJECT
SECTION 00500
TOWN OF TIBURON
TIBURON, CALIFORNIA
OWNER CONTRACTOR AGREEMENT FOR THE
TIBURON POLICE STATION
CONSTRUCTION PROJECT
THIS OWNER-CONTRACTOR AGREEMENT ("Agreement") is made and entered into I
da of ~v .1998, by and between the TOWN OF TIBURON, a
this day
municipal corporation, 15 5 Tiburon Boulevard, Tiburon, CA 94920, ("Owner's
and Sl, VO90 GaVfg-AWCT/acl.0dse prinicipal place of business is C/
Contractor").
In consideration of the mutual covenants and agreements set forth herein, Contractor and
Owner hereby agree as follows:
ARTICLE I
CONSTRUCTION
s of this Agreement, the Contractor shall do all the
Subject to and in accordance with the termii`
work and furnish all the labor, services, materials and equipment necessary to construct and
complete, in accordance with the Contract Documents (as hereinafter defined) in a good,
workmanlike and substantial manner and to the satisfaction of Owner, the Tiburon Police Station
Construction Project ("Project") upon that real property located in Tiburon, California more
particularly depicted on Exhibit A (the "Site"). The Project is that described and reasonably inferable
from the drawings and specifications and documents enumerated in Exhibit B, such construction and
furnishing of labor, services, materials and equipment and the performance of Contractors other
services and obligations required by the Contract Documents are hereinafter referred to as the
"Work." The term "Contract Documents" shall mean this Agreement, and all of the items
enumerated in Exhibit B.
00500 - ,
OWNER-CONTRACTOR AGREEMENT
TIBURON POLICE STATION
CONSTRUCTION PROJECT
ARTICLE II
CONTRACT SUM
Owner shall pay and Contractor shall accept as full compensation for the Work the sum
("Contract Sum") set forth in Exhibit C. Progress payments to the Contractor shall be made in
accordance with Article 9 of the General Conditions.
ARTICLE III
TIME FOR PERFORMANCE
Section 3.1. Definitions. As used in this Agreement:
The term "Completion Date" shall mean the date that all the Work is substantially complete.
The term "Direct Costs" shall mean the premium portion of overtime pay, additional crew, shift or
equipment cost and such other items of cost requested in advance by Contractor and approved by
Owner, -which approval shall not be unreasonably withheld.
The term "Excusable Delay" shall mean an actual delay in the performance of the Work by
Contractor caused by any of the following if such events are beyond the reasonable control of
Contractor despite having taken all reasonable attempts to prevent, avoid delay and mitigate the
effects thereof, and as set forth in Section 9.11 of the General Conditions:
A. act or omission of Owner, or by an employee, agent or representative of Owner (other than
by reason of the proper exercise of their respative rights, duties and obligations under the
Contract Documents); or
B. fire, flood, unusually severe and abnormal weather conditions beyond the anticipated average
number of rain days per year over a ten (10) year period based on historic weather data, war,
embargo, sabotage, hurricane, earthquake, tornado or by injunction (not the fault of
Contractor) (see Section 9.11.3 of the General Conditions); or
C. general strike, regulatory delays, strikes in or losses during transportation, or other similar
event which is beyond Contractor's control.
k.
The Contractor acknowledges that actual delays in activities that do not prevent the Contractor from
completing the work by the Scheduled Completion Date ("non-critical delays") will not constitute an
.a
00500 - 2
OWNER-CONTRACTOR AGREEMENT
TIBURON POLICE STATION
ONSTRUCTION PROJECT
calendar days of the commencement of any such delay and the written approval of such extension of
time is obtained from the To-Am Manager, his designee, or other duly authorized agent of the Owner.
A waiver of any requirement in this Section 3.3 herein contained, including but not limited to time
within which application for extension of time may be made, or requirement for written application
and written approval thereof in connection with any or all past delays, shall not constitute a waiver by
Owner of any of such requirements in connection with any present or future delays. No verbal
approval, either express or implied, or any grant of time extension by Owner or its agents shall be
binding upon Owner unless and until such approval is expressly ratified in writing.
In the event the Contractor is delayed in the Work by any Excusable Delay and other than for
financial reasons, the Contractor's remedy, if at all, shall be limited solely to an extension of time. In
no event shall it be entitled to a monetary payment over and beyond that which is specified in the
Contract Documents and the duly executed change orders thereto for any damages of any kind
whatsoever arising by reason of such Excusable Delay, including but not limited to money actually
expended on the job by reason of such delay for salaries, equipment and materials, loss of anticipated
profits, and overhead or indirect costs.
In the event of delay in the Work which is not due to an Excusable Delay, Owner may direct that the
Work be accelerated by means of overtime, additional crews or additional shifts or resequencing of
the Work. All such acceleration shall be at no cost to Owner. In the event of Excusable Delay,
Omer may similarly direct acceleration and Contractor agrees to perform same on the basis of
reimbursement of Direct Cost plus a fee of five percent (5%) of such cost but expressly waives any
other compensation therefor. In the event of any acceleration requested pursuant to this paragraph,
Contractor shall provide promptly a plan including recommendations for, in Contractor's opinion, the
most effective and economical acceleration.
Section 3.4 Time; Liquidated Damages. For each calendarday's delay beyond either the
Scheduled Completion Date or the Interim Completion Date, (which delays are not excused pursuant
to Section 3.3 of this Agreement), Contractor shall forfeit and pay to Owner the sum of Five Hundred
Dollars ($500.00) as liquidated damages.
OWNER C T R) W, T OR
00500 - 4
OWNER-CONTRACTOR AGREEMENT
CONSTRUCTION PROJECT
ARTICLE IV
PREVAILING WAGES
The general prevailing rate of per diem wages and the general prevailing rate for holiday and
overtime work in this locality for each craft, classification, or type of workman needed to execute this
Agreement is that ascertained by the Director of the Department of Industrial Relations of the State
of California, copies of which ("Prevailing Rate Schedules") are on file in the Owner's principal
office. The Prevailing Rate Schedules shall be made available to any interested party on request.
The holidays upon which such rates shall be paid shall be all holidays recognized in the collective
bargaining agreement applicable to the particular craft, classification or type of workman employed
on the Project. Contractor shall post the Prevailing Rate Schedule at the Site.
Contractor shall forfeit, as a penalty as set forth in California Labor Code § 1775, twenty-
five dollars ($25.00) for each calendar day or portion thereof, for each workman paid less than the
prevailing rates set forth in the Prevailing Rates Schedules for any work done under the Contract
Documents or an), work- done by any subcontractor under Contractor. Contractor shall comply with
the payroll records requirements set forth in Section 16.6 of the General Conditions and the
provisions in Section 16.4 of the General Conditions concerning apprentices and.shall be responsible
for causing all of Contractor's subcontractors to comply with these requirements and provisions.
ARTICLE V
NON-DISCRIMINATION
The Contractor hereby agrees to comply with the provisions contained in Article 15 of the
General Conditions regarding non-discrimination, equal employment opportunity and affirmative
action.
ARTICLE VI
WORKER'S COMPENSATION INSURANCE
By my signature hereunder, as Contractor, I certify that I am aware of the provisions of
Section 3700 of the Labor Code which require every employer to be insured against liability for
Worker's Compensation or to undertake self-insurance in accordance with the provisions of that
Code, and I will comply with such provisions before commencing the performance of the Work of
this Agreement.
00500 - 5
OWNER-CONTRACTOR AGREEMENT
TIBURON POLICE STATION
CONSTRUCTION PROJECT
ARTICLE VII
CONFLICT
In the event of conflict between the terms of this Agreement and the bid or proposal of said
Contractor, then, this Agreement shall control and nothing herein shall be considered as an
acceptance of the terms of the proposal conflicting herewith.
ARTICLE VIII
EXHIBITS
This Agreement includes the following Exhibits which are attached hereto and incorporated
herein by reference:
Exhibit A The Site
Exhibit B Contract Documents
Exhibit C Contract Sum
x
00500 - 6
OWNER-CONTRACTOR AGREEMENT
Tj f-'% it IRON POLICE STATION
C y .,,STRUCTION PROJECT
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the
day and year first hereinabove written.
APPROVED AS TO FORM:
y
Town Attorney
CONTRAC .
By
Its
Contra tor's License No. 3 7 z,6
Expiration Date: 3
TOWN OF TIBURON
By
~ ~if/YJ/Y1dr~Q~vo•.
y J.
00500 - 7
OWNER-CONTRACTOR AGREEMENT
AA-"%Ji%vil E%J .A%_r. J1A11V1r
CONSTRUCTION PROJECT
EXHIBIT A
SITE MAP
[Attached]
,y
00501 -1
Town of Tiburon OWNER-CONTRACTOR AGREEMENT EXHIBITS
L
73
- - --j
f--.
t f
i 1
O
S
S
t I
O
f f
w
_
f I
I
a~
LL
t-
I ~ f
Q 0
i f
f ~~n f
_l cal .
~ ~ ~
t
1
IF.
,j
'
~
n Kai
,a.
'
all
f
ti f r
~pOcn
tL
Z ~
~_F•nq
~
cq
0
S
(Ale,
m
/
J!
O
W /
d,
a / ttv
S?d
3
i•
n
e
me
+ ~ h ~1
r,
r u f~ -1
1% ev
ell
e
~ ~ zto
w
J
Z~
.o
~I
tr.
kw
IL
Q
-.l
imp
in irl
u-~
fY .1
~ Av~o
, 4-
~S
~ a
O ~
V
c\~
T
0
0
Z h
Q
f'- h
JQ0
3
~c q
zo
K1
T ,
Q r^I~'~4T
4
u
Mme.:
G
ILI
}
;Y
=3 iLl
xa
GY(,a
=
111 w ~
0-
Z d) Q
w d)
<
'Z co
~1!
i--
z lo
w
~
U~ aCP
O
A
0
N
3URON POLICE STATION
CONSTRUCTION PROJECT
EXHIBIT B
CONTRACT DOCUMENTS
The following documents, current as of the date of signature of the Owner-Contractor Agreement, comprise
the Contract Documents:
0,"mer-Contractor Agreement
General Conditions
Project Drawings, as listed on Sheet A0.1 of the Project Drawings
Project Specifications, as listed in the Table of Contents of the Project Specifications.
Addenda, Substitutions, Modifications, Change Orders and Written Interpretations.
Bidding Documents
,r t",
00501 - 2
Town of nburon OWNER-CONTRACTOR AGREEMENT EXHIBITS
F.
TIBURON POLICE STATION
CONSTRUCTION PROJECT
EXHIBIT C
~r
+'j ~
CONTRACT SUM
A. BASE BID
Total lump sum price, including the furnishing of all labor, materials, services, equipment,
fringe benefits, taxes, insurance, overhead and profit and any other costs or expenses
necessary to complete the Base Bid Work in accordance with the Contract Documents:
o ^1* 04f~x .5 ~r i L DOLLARS
($&6-30,,000
)
B. ACCEPTED BID ALTERNATES
(As listed in Specification Section 01030 and described in the Sections referenced therein
and on the Project Drawings).
Alternate No. 1: lg 64
13O TARS
5 e .Jt' 4n ~ vo d
Alternate No. 2:
DOLLARS
F,00501 - 3
` Town of Tiburon OWNER-CONTRACTOR AGREEMENT EXHIBITS
TIBURON POLICE STATION
CONSTRUCTION PROJECT
C. TOTAL CONTRACT SUM (including Accepted Bid Alternatives):
~ 61.~ C rt,
Lu - 4,,~l
1; If!"
00501 - 4