Loading...
HomeMy WebLinkAboutAgr 1998-02-26 (Scott Kern Communications)~v 1 SCOTT KERN COMMUNICATIONS 15 LONGVIEW COURT SAN FRANCISCO, CA 94131 PHONE 415/821-2572, FAX 415/821-0342 CA - CONTRACTOR LICENSE 483690 Date: February 26, 1998 Town Of Tiburon Attn: Robert L. Kleinert Town Manager 1505 Tiburon Boulevard Tiburon, CA 94920 --1 4, 7 6 415/435-7373 Telephone 415/435-2438 Fax WORK ORDER AGREEMENT Contract Number: 2072 Job Site Location: Tiburon Town Hall, 1505 Tiburon Boulevard, Tiburon, California. This agreement is between Town Of Tiburon, hereinafter referred to as "Client", and Scott Kern, California State Contractor's License Number: 483690, hereinafter referred to as "Contractor". It is established for the purpose of providing Client with the services described below. The parties agree as follows: Goal: Install cable and connections to support Voice services for twenty four jack locations, within the Council Chambers, to support an interim Emergency Operations Center. This proposal is based upon the information provided by Town Of Tiburon. i n{l~ti? 1++113 ~J 21i1>f!{lt'r {tl:..n((ly it+iid 5: H !$ii!i!Ei t.~2YI PAGE I OF CONTRACT - 2072 PLEASE INITIAL REVISION ONE Workstation Cabling Contractor will install one segment each, four pair Category 3 cable from the second floor wire closet location to the two vacant outlet locations, within the Council Chambers. Workstation Termination Within the Council Chambers, Contractor will remove and replace the existing telephone faceplates and jacks so that the cables, including the two new cables, are terminated to support four telephone jacks each (total of 24). All faceplates will be labeled with each telephone number. Wire Closet Termination Contractor will terminate the two new cables onto 66M 1-50 punch blocks to match the existing. Contractor will then cross-connect the 24 specified telephone numbers to the newly installed jacks. If Client does not specify which numbers are assigned to which jacks, than Contractor will randomly assign them. Testing Upon completion of the installation process, Contractor will test each jack. Warranty During the final planning stages and throughout the job, Contractor will confer with the appointed representative(s) of Client on any point that is questionable. In addition, Contractor will welcome any input that will help insure the total success of the job and the complete satisfaction of Client. All work will be performed in a professional manner and will be warranted against defects in material and workmanship for a period of Three Years from the date of substantial completion. PAGE 2 OF CONTRACT - 2072 PLEASE INITIAL, REVISION ONE Material Costs Include: DESCRIPTION QUANTITY FOUR PAIR CATEGORY 3 NON-PLENUM 200 QUADPLEX FACEPLATES 6 RJ14 JACK MODULES 24 25' RJI I LINE CORDS 24 LABELS 24 Total cost of performing these tasks as outlined, will be: Lump Sum Total $910.00 Payment terms 100% due 10 DAYS from completion of work $910.00 PAGE 3 OF CONTRACT - 2072 PLEASE INITIAL REVISION ONE IN WITNESS WHEREOF, Client and Contractor have executed this contract as of the date(s) indicated below. SCOTT KERN Date Signe By: Town Of Tiburon By: Title: T-~ Date Signed: PAGE 4 OF CONTRACT - 2072 PLEASE INITIAL REVISION ONE