Loading...
HomeMy WebLinkAboutAgr 1993-03-02 (Miller Pacific)-7 P A C I F I C ENGINEERING G R O U P AGREEMENT FOR PROFESSIONAL SERVICES MILLER PACIFIC ENGINEERING GROUP (MPEG), a California Corporation, and, Name: Town of Tiburon (CLIENT) Address: 1155 Tiburon Blvd. Tiburon, California Attn: Stan Bala AGREE that MPEG will provide to CLIENT Geotechnical Engineering services, under MPEG's General Conditions, and Schedule of Charges as follows: PROJECT LOCATION: Martha Company Property Paradise Drive at end of Mountain View Drive SCOPE OF WORK: Geotechnical review for Town of Tiburon REF: General Conditions, Schedule of Charges DATE MPE aL~:~- Euge e . Miller, President DATE ~2 CLIENT M I L L E R P A C I F I C ENGINEERING MILLER PACIFIC ENGINEERING GROUP G R o u P GENERAL CONDITIONS 1.0 CHARGES Unless otherwise agreed, charges will be determined on a time and expense basis in accordance with MPEG's current Schedule of Charges. Such schedule is subject to revision annually and other times without notice to Client. 20 INVOICES will be submitted every two weeks, or four week accounting period, at the end of a project phase or assignment as elected by MPEG. Invoices are due and payable upon presentation. All accounts not paid within 30 days of the invoice date may be subject to a finance charge of 1.5% per four week accounting period, or the maximum rate allowed under applicable law whichever is less. MPEG reserves the right to cease work, withdraw reports, and file liens on property where accounts are past due. 3.0 SITE ACCESS and UNDERGROUND OBSTRUCTIONS Client will furnish right-of-entry to the project site as necessary for exploration, surveys and other services. MPEG will take reasonable precautions to minimize property disruption and damage however some disruption and damage is often unavoidable. MPEG is not liable for nor does MPEG's fee estimate include full restoration of such property unless explicitly itemized in the agreement. Where appropriate, MPEG will request utility companies to locate off-site utility lines. Client shall indicate the location of all utilities and underground structures within the property. Client agrees to hold MPEG harmless for damage to utilities and/or underground structures not correctly located. 4.0 HAZARDOUS MATERIALS and OTHER EXCLUSIONS This agreement specifically excludes and MPEG specifically disclaims and is discharged from any responsibility or liability for all direct or indirect loss or harm resulting from the presence, failure to discover, interception, escape or discharge of hazardous or toxic material of any kind including contamination of soil, water, air or other property as a result thereof. This exclusion extends, but is not limited, to all exploration, testing, analysis and recommendations made by MPEG. Unless specified in the written scope of work the observation, testing and approval of steel, concrete, and asphalt and other construction materials, and establishing construction lines and grades and other surveying is also excluded from MPEG's scope of work, responsibility and liability therefore. 5.0 STANDARD OF CARE Services provided by MPEG will be consistent with the ordinary level of care and skill exercised by members of the profession practicing geotechnical engineering under similar conditions, in the same locality and at the same time. There is no other warranty either express or implied. The client recognizes that subsurface conditions may vary and that data and interpretations made by MPEG are based solely on information available to MPEG. MPEG is not responsible for interpretations or use by others of information developed by MPEG. 6.0 INSURANCE and UMfTATION OF LIABILITY MPEG maintains General Liability Insurance and depending on availability and affordability intends, but is not bound, to maintain Professional Liability Insurance. Such insurance is for the sole benefit of MPEG and does not cover the Client nor the project. Client recognizes the inherent risk of claims associated with the services provided by MPEG and therefore agrees (a) to limit MPEG's liability to Client for professional negligence, errors or omissions or breach of this Agreement, such that the total aggregate liability of MPEG shall not exceed the amount of fees paid MPEG for this project, or $20,000 whichever is greater, (b) to compensate MPEG for time and expenses incurred by MPEG in defense of claims except for claims arising out of MPEG's sole negligence and (c) to defend, indemnify and hold harmless MPEG and its employees against claims related to hazardous or toxic materials and from contractors, subcontractors and others arising from services under this agreement except for claims arising out of MPEG's sole negligence. 7.0 JOB SITE SAFETY Client agrees that construction job site safety, superintendence of the contractor's, workmen and equipment, excavation stability, is solely the contractor's responsibility and is specifically excluded from MPEG's responsibility or liability. 8.0 OWNERSHIP OF MATERIALS All samples obtained by MPEG are and remain property of the client, and unless otherwise directed, all such samples may be discarded by MPEG 30 days after performance of tests or submittal of the report for which they were obtained, or termination of services. All records, field and laboratory data, analysis, designs, reports, letters and other documents prepared by MPEG are instruments of service and remain the property of MPEG. 9.0 DISPUTES If a dispute arises out of or related to this contract or its alledged breach, and if the dispute cannot be settled through direct discussions, the parties agree to first endeavor to settle the dispute in an amicable manner by mediation through the Judicial Arbitration and Mediation Service, San Francisco with each party paying an equal share of the cost thereof. sTOGENCON.12/91 1.1 l L L G R P A C I F I C ENGINEERING n a n II P MILLER PACIFIC ENGINEERING GROUP SERVICES IN THE GEOSCIENCES SCHEDULE OF CHARGES (EFFECTIVE JANUARY 1, 1980) Professional Engineering and Geological Consulting Service Professional Personnel (Engineer or Geologist)* Hourly Rate Staff $ 58 Project 68 Senior 78 Associates 88 Principal $110 Technical Personnel* Jr. Technician, Jr. Drafter $ 36 Technician, Drafter $ 48 Senior Technician, Field Supervisor $ 58 Administrative Personnel (for directly project related work) Word Processor, Project Clerical $ 32 Other Inside Charges Travel time, normal hourly rates Mileage (Administrative) 0.40 per mile Vehicle (field) $ 8 per hour Nuclear Density gage $ 8 per test Micro Computer Program charge + 20 per hr. FAX (send or receive) $ 2 per page Outside Services Cost + 15% Rental of exploration equipment, photography, public transportation, per diem, shipping, courier/delivery services, long distance telephone, outside reproduction, and other services and supplies not normally provided. * NOTE: 1. Field site visits, 2 hour minimum. Travel time is portal to portal. 2. Overtime premium for weekday and Saturday is $15/hr, for Sunday and Holiday is $25/hr. 3. Rates are for normal Geotechnical Engineering and Geological services. Normal rates for depositions and testimony are $700 per half day or any part thereof. SCHEDCHG.GEN