Loading...
HomeMy WebLinkAboutTC Res 2017-08-16 RESOLUTION NO. 25-2017 A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF TIBURON UPDATING TRAFFIC MITIGATION FEES FOR DEVELOPMENTS WITHIN THE TOWN OF TIBURON WHEREAS,the Town of Tiburon first established Traffic Mitigation fees through the adoption of Ordinance No. 232 N.S. and Resolution No. 1125 in 1980; and WHEREAS, the Town of Tiburon periodically revises its Traffic Mitigation fees as necessary following updates of the General Plan Circulation Element; and WHEREAS, the Town of Tiburon has adopted enabling legislation, codified as Chapter 14B (Public Facilities Development Fees) of the Tiburon Municipal Code, authorizing the establishment of and administration of such fees,including traffic mitigation fees; and WHEREAS,the Tiburon General Plan Circulation Element,updated and adopted in February 2016,identifies impacts of contemplated future development on existing circulation facilities in the Tiburon Planning Area,along with an analysis of the need for new circulation improvements to accommodate new development; and WHEREAS, based upon the identified circulation system improvements in the updated General Plan Circulation Element, the Town's traffic mitigation fees must be adjusted correspondingly; and WHEREAS,in December,2016 the Town retained the transportation consulting firm of Nelson/Nygaard to prepare an analysis and update of its traffic mitigation fee program based on the updated General Plan Circulation Element; and WHEREAS, in July 2017, the Tiburon Traffic Mitigation Fee Update report (hereafter"Update"), was completed by Nelson/Nygaard and released to the public; and WHEREAS,the Update has established the relationship between contemplated future development, the needed facilities, and the estimated costs of those improvements; and WHEREAS, the General Plan Circulation Element, Update, and other relevant information referenced herein were available for public inspection and review for more than ten(10)days prior to the public hearing at which the fee update was considered for adoption; and WHEREAS,the Town Council has held a duly-noticed public hearing and provided notice as required by law pursuant to the update of the Traffic Mitigation fees; and Tiburon Town Council Resolution No. 25-2017 Adopted 08/16/2017 Effective 10/15/2017 1 WHEREAS, the Town Council additionally finds as follows with respect to the herein proposed fee program: A. The purposes of the traffic mitigation fees are to provide funds for increasing street capacity to accommodate additional traffic generated by new development,and specifically to maintain major intersections within the Tiburon Planning Area operating at acceptable levels of service as set forth in the General Plan Circulation Element; and B. The traffic to be generated by projected levels of development in Tiburon will exceed the Town's adopted traffic level of service standards for various intersections in the absence of substantial improvements. There is a substantial government interest in maintaining a system of local streets which can satisfactorily accommodate projected levels of traffic; and C. In order to project its circulation needs,the Town of Tiburon undertook a comprehensive review of the Town's streets and traffic patterns as they currently exist and as they are projected to exist in the future. This study is embodied in the Future-Year Traffic Analysis with Proposed Circulation Network Improvements,prepared by Nelson/Nygaard and dated November 2014, the Town's current General Plan Land Use Element, and the Town's Vacant&Underdeveloped Parcel Inventory updated through September 2014. Information contained in these documents was used to run the Tiburon Traffic Model and generate the results obtained by the 2016 Circulation Element and the Update. D. The 2016 Circulation Element provides a basis for estimating Tiburon's projected traffic needs and identifies the street improvements necessary to accommodate that traffic. Cost estimates of these improvements have been developed by the Town and its consultants. The Tiburon Traffic Model provides a basis for determining a fair allocation of costs among the users of the streets by factoring trip generation and distribution of new development projects, and assessing their pro-rata contribution of new trips through affected intersections; and E. Based upon extensive traffic studies and the Tiburon Traffic Model, the current circulation system in Tiburon will not be sufficient to accommodate the amount of traffic projected to be generated by new development. Without significant circulation improvements,the level of service available on the streets in the Planning Area will seriously deteriorate, resulting in a decrease in land values, a decrease in tax revenues, more traffic accidents, ?ower levels of employee productivity, and lower resident quality of life; and F. The estimated cost of accommodating the increased traffic through intersection widening, installation of traffic signals and other local traffic mitigation is approximately$10,270,216 based on the Update. Traditional transportation improvement funding sources will not keep pace with the need for and cost of transportation improvements caused by new development. The Town therefore seeks to require all new development to contribute to the cost of mitigating traffic problems by imposing traffic mitigation fees for circulation improvements. Tiburon Town Council Resolution No. 25-2017 Adopted 0811 612 01 7 Effective 1011512017 2 G. There is a reasonable relationship between the need for the improvements to be funded by the fee and the type of development project upon which the fee is imposed. Specifically, every project on which the fee is imposed generates increased traffic throughout the Town. This generation of traffic in turn requires that, in order to maintain acceptable levels of service, traffic improvements be made to accommodate the increased traffic. There is a reasonable and direct connection between the need for the improvements and the type of development project upon which the fee is imposed. H. There is a reasonable relationship between the fee's use and the type of development for which the fee is charged. The fee will be used exclusively to construct circulation improvements, such as roadway and intersection improvements and the engineering, plaraiing and administrative costs directly related to such improvements. The use of the funds will therefore directly relate to and benefit the development projects upon which the fee is imposed; and I. The Town Council finds that there is a reasonable relationship between the amount of the fee and the cost of the projected required improvements. Cost of improvements has been determined using standard engineering practices. Using the Tiburon Traffic Model, a project's share of the improvement costs has been determined by multiplying the improvement costs by the ratio of the number of PM peak trips generated by the project to the total number of PM peak hour trips generated by all projects within the limits of the Tiburon Traffic Model. Thus,the fee per project is proportional to that project's contribution to increased traffic. J. The Town Council finds that Tiburon's circulation system is almost totally dependent on Tiburon Boulevard,the major spinal roadway through which the vast majority of vehicular traffic enters and exits the Town. Therefore, for purposes of establishing a Zone of Benefit for circulation system improvements, it is logical and reasonable to designate the entire Tiburon Planning Area as a single benefit zone. NOW, THEREFORE, BE IT RESOLVED, that the Town Council of the Town of Tiburon does hereby establish updated traffic mitigation fees for new development within the Town of Tiburon as more particularly set forth hereinafter. 1. Definitions. (a) "Building Permits"means a permit required by and issued pursuant to Chapter 13 of this Code. (b) "Circulation Improvements" includes but is not limited to the construction of or improvement to street rights of way, traffic signals, overcrossings, underpasses, curbs, gutters, sidewalks, street pavement, and drainage improvements incidental to street improvements necessary to provide traffic circulation consistent with the Circulation Element of the Tiburon General Plan. For purposes of this definition street includes highway or road. Tiburon Town Council Resolution No. 25-2017 Adopted 08/16/2017 Effective 10/15/2017 3 (c)"New Development"means any new construction or use that requires the issuance of a building permit,zoning or subdivision entitlement and which generates additional traffic trips above that generated by the previous lawful use of the land. (d) "PM Peak Hour Trip"means a vehicular trip generated by a given land use during the one-hour period of highest traffic volume during the PM peak period of 4-6 PM as defined in the Tiburon Traffic Model (e)"Tiburon Traffic Model"means the Synchro and VISTRO Model-based program utilized by Nelson/Nygaard in their above-referenced analyses. The Tiburon Traffic Model projects future traffic through defined intersections and determines Levels of Service of the defined intersections based upon existing and projected levels of development. (f) "Subdivision Entitlement" means a permit issued pursuant to Chapter 14 of this Code. (g)"Zone of Benefit"is for the purposes of this resolution the entire Planning Area of the Town of Tiburon as set forth in the Tiburon General Plan, including those portions of surrounding county and municipal governments that generate traffic tributary to Tiburon Boulevard for traffic assessment purposes. (h) "Zoning Entitlement" means a permit issued pursuant to regulations set forth in Chapter 16 (Zoning) of the Tiburon Municipal Code. 2. Fee Imposed. (a) A traffic mitigation fee shall be charged and paid at the time of issuance of a building permit for development. The amount of the fee shall be as set forth in this resolution, which upon taking effect shall supersede all traffic mitigation fee amounts set forth in prior resolutions of the Town Council, including specifically Resolution No. 02- 2007. (b)To the extent permitted by law,the fee established by this resolution shall be paid prior to occupancy for any project not required to obtain a building permit from the Town of Tiburon. 3. Fee Amount Calculations and Distribution. (a) Fee calculations shall be based upon the fee amount of$7,174.76 for each new PM peak hour trip generated,as determined in the Update. This PM peak hour trip fee shall be multiplied by the number of new PM peak hour trips generated by the project. PM peak hour trip generation rates for various categories of land uses are identified in attached Table 1. Trip generation rates for land uses not defined in Table 1 shall be defined based on the latest edition of the Institute of Transportation Engineers'Trip Generation. For unique land uses not covered by the above-referenced publication, a special study of comparable locations shall be made to the satisfaction of the Town Engineer. (b) The fees collected pursuant to this resolution shall be distributed into the following traffic mitigation fee account: Tiburon Circulation System Improvement Fund (CSIF). Tiburon Town Council Resolution No. 25-2017 Adopted 08/16/2017 Effective 10/1512017 4 (c) Construction Cost Index. The PM peak hour trip fee set forth in Section 3(a) above is calculated in December,2016 dollars and shall be adjusted on July 1 of each year in accordance with the Engineering News Record's Construction Cost Index for the San Francisco Bay Area, which cost index sat at 11609.44 as of December, 2016. 4. Exemptions. Projects to be exempted from the imposition of traffic mitigation fees include: (a) Municipal and other governmental uses. (b) Reconstruction or remodel projects where there is no increase in use or intensity causing an increase in traffic. (c) Accessory uses creating no increase in traffic. (d) Affordable housing units,as defined in the Tiburon Municipal Code Chapter 16 (Zoning). (e) Accessory dwelling units and junior accessory dwelling units, as defined in the Tiburon Municipal Code Chapter 16 (Zoning). 5. Payment of other Fees Required. Nothing in this resolution exempts any new development from payment of any or all other applicable fees adopted by the Town. 6. Use of Fee Revenues Public Facilities Accounts From and after the effective date of this resolution,the revenues raised by payment of the traffic mitigation fee shall be placed in a separate and special account as provided herein and such revenues, along with any interest earnings on the account, shall be used for the following purposes: (a) To pay for the planning,design and construction(including administration of construction) of designated circulation improvements; (b) To reimburse the Town for designated circulation improvements constructed by the Town with local funds from other sources (unless the Town funds were obtained from grants or gifts),and provided that such reimbursement is proportionate with the impact of the new development; (c) To reimburse developers who have designed and constructed designated circulation improvements having size,length or capacity beyond that needed to mitigate impacts of that developer's individual development project; (d) To pay for and/or reimburse costs of development and ongoing updating and administration of the traffic mitigation fee program. Tiburon Town Council Resolution No. 25-2017 Adopted 08/16/2017 Effective 10/15/2017 5 7. Expenditure of the Fees. Fees collected pursuant to this Resolution shall be expended only for those facilities identified in the General Plan Circulation Element and only for the purposes for which the fee was collected. 8. Review and Reporting_ Annual and periodic reporting and making of required findings shall be performed as set forth in California Government Code section 66000 et seq., or any successor sections thereto. 9. Fee Adjustments; Appeals of Fee Determination. Fee adjustment requests and appeals of fee determinations shall be governed by provisions of Section 1413-8 of the Tiburon Municipal Code. NOW, THEREFORE, BE IT FURTHER RESOLVED that this Resolution and its associated fee shall become effective sixty (60) days after its adoption. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Tiburon held on August 16, 2017, by the following vote: AYES: COUNCILMEMBERS: Fredericks, Kulik, O'Donnell NAYS: COUNCILMEMBERS: Fraser ABSENT: COUNCILMEMBERS: Thier JIM , MAYOR TO OF TIBURON ATTEST: LEA STEFA I, TOWN CLERK Attachment: Table 1---Trip Generation Rates for Various Land Uses Tiburon Town Council Resolution No. 25-2017 Adopted 08/16/2017 Effective 10/15/2017 6 TABLE 1 TRIP GENERATION RATES Land Use Units PM Peak PM Peak Total PM Rate In Rate Out Peak Rate Single Family DU 0.70 0.44 1.14 Multi Family DU 0.46 0.25 0.71 Accessory Dwelling Unit* DU 0.15 0.12 0.27 Retail 1,000 sq. ft. 1.80 1.80 3.60 Office 1,000 sq. ft. 0.25 1.24 1.49 Library 1,000 sq. ft. 2.28 2.46 4.74 Community Recreation 1,000 sq. ft. 7.0 6.0 13.0 *Exempt from Traffic Mitigation Fee Source: Town of Tiburon and Nelson/Nygaard, 2017 Tiburon Town Council Resolution No. 25-2017 Adopted 08/16/2017 Effective 10/15/2017 7