HomeMy WebLinkAboutTC Res 2013-01-16 (6)RESOLUTION NO. 06-2013
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF TIBURON
ADOPTING A REVISED FEE SCHEDULE FOR THE TOWN ENGINEER AND
PUBLIC WORKS DEPARTMENT
WHEREAS, the Tiburon Municipal Code requires that any changes to the Town's filing and
processing fees be set forth by Resolution of the Town Council, and
WHEREAS, it is the intent of the Town Council that such fees be used to reimburse the Town for
the costs of providing the services for which the fees are assessed, thereby maintaining productive and
efficient service levels commensurate with the work demands within the Town's various departments, and
WHEREAS, from time to time it is necessary to revise these fees to reflect actual costs incurred by
the various departments in the normal course of its operation and according to its obligations to administer
State statutory requirements under the authority of Town ordinances, and
WHEREAS, the Town of Tiburon has provided required notice and held a public hearing pursuant
to state law and local ordinances.
NOW, THEREFORE, BE IT RESOLVED that the Town Council of the Town of Tiburon does
hereby adopt a revised fee schedule for the Town Engineer and Public Works Department staff, said fee
schedule being attached hereto as Exhibit A, said fee schedule to become effective 60 days from the
passage of this resolution and to supersede the fee schedule set forth in Exhibit A of Resolution No. 07-
2008.
PASSED AND ADOPTED at the regular meeting of the Town Council of the Town of Tiburon
on January 16, 2013 by the following vote:
AYES: COUNCILMEMBERS: Doyle, Fraser, Fredericks, O'Donnell
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: Collins
EMMETT O'DONNELL, MAYOR
TOWN OF TIBURON
ATTEST:
b
DIANE CRANE I, TOWN CLERK
Town Council Resolution No. 06-2013 Effective 03\17\2013 Page 1
EXHIBIT A
TOWN ENGINEER/PUBLIC WORKS DEPARTMENT FEE SCHEDULE
(Effective 03/17/2013)
The Town Engineer's application review fee includes the time spent by the Town Engineer and his staff to make
one (1) site inspection, an initial review of submitted plans and maps for completeness, a second review of the
submitted plans and maps, a consultation with Community Development Department staff and preparation of
written conditions and/or recommendations. The Town Engineer's fee for additional work beyond that specified
above, and for other applications where a specific fee is not listed, will be based on the actual time spent by the
Town Engineer or his staff in accordance with the Town Engineer's personnel schedule. Where not otherwise
indicated, the Town Engineer will determine a fee if review is determined to be necessary by the Director of
Community Development or Building Official.
A. Planning & Zoning Applications
1. Conditional Use Permit (Major) .......................................................................................$1,600.00*
2. Precise Development Plan ................................................................................................$2,500.00*
3. Conceptual Master Plan ...................................................................................................$1,000.00*
4. Traffic Study Review .......................................................................................................$1,000.00*
B. Site Plan and Architectural Review Application Referral (complex applications only)
1. Design Review application ..............................................................................................$450.00*
2. New Residence or Non-Residential Building ..................................................................$750.00*
3. Grading, Filling or Earthwork $11000.00*
C. Subdivisions and Related Permits and Services
1. Tentative Map Application, Where Final Map Required .................................................$5,325.00*
2. Tentative Map Application, Where Parcel Map Required $1,700.00*
3. Final Map .........................................................................................................................$5,325.00*
4. Parcel Map .......................................................................................................................$5,325.00*
5. Subdivision Improvement Plan Review $5,325.00
6. Field Inspection ..........................................................................3% of the Value of Improvements
D. Building Permit Drainage & Site Review Application
1. New Building ..................................................................................................................$500.00
2. Exterior Addition/Remodel ..............................................................................................$350.00
E. Encroachment Permit
1. Application Processing Fee (applies to all Encroachment Permits) .................................$85.00**
2. Debris Box-only Encroachment Permit Inspection Fee ...................................................$75.00
3. Minor Encroachment Permit Inspection Fee ....................................................................$150.00
(e.g., driveway approaches, curb drains, fences, paving or concrete work less than 175 sq. ft.)
4. Major Encroachment Permit Inspection and Plan Review Fee: 3% of Valuation of Improvements
5. All other Encroachment Permit applications, in the reasonable discretion of the Town Engineer, are
subject to a $325.00** initial deposit filing fee, and additional fees may be assessed based on actual
processing time and adopted hourly rate schedules.
F. Variance from Flood Damage Prevention Regulations (Chapter 13D of Municipal Code) $750.00*
*Fee shall be considered an initial non-refundable deposit. Additional fees may be required if actual Town costs to process
the appeal exceed this initial deposit amount.
**Includes $25 Technology Recovery Fee
Town Council Resolution No. 06-2013 Effective 03\17\2013 Page 2